When the Sochi Winter Olympics kick off next month (Feb. 7-23) in Russia, the temporary pavilion for Russian telecom operator MegaFon is going to turn a lot of heads—literally.
The company commissioned London-based designer Asif Khan to create a one-of-a-kind installation for the Games. Khan answered with MegaFaces, a 39-foot-high, illuminated façade that acts much like a giant pin screen, replicating the faces of people in the crowd in the form of a 26-foot-high, 3D mural.
The kinetic façade will display three faces simultaneously, and each participant will receive a 20-second video clip of their experience via email.
Here's how it works, according to a report by Dezeen: People step into a 3D photo booth to have their face scanned from five different angles.
Using the data, a computer creates a 3D model of the facial structure (in about a minute) and sends the coordinates to an engine-and-cable system that controls a series of actuators that make up the kinetic portion of the façade. Each one of the 10,000 actuators can extend out to lengths of six feet, allowing for the creation of dramatic, 3D murals.
Don't believe us? See for yourself:
Related Stories
| Mar 5, 2012
Gilbane Building Co. wins top honors at ASA Houston awards ceremony
Gilbane was also named General Contractor of the Year for the seventh time in 11 years and won the inaugural Safety Program of the Year award.
| Mar 5, 2012
Franklin Institute in Philadelphia selects Skanska to construct new pavilion
The building has been designed by SaylorGregg Architects and will apply for LEED Silver certification.
| Mar 2, 2012
By the Numbers
66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs.
| Mar 1, 2012
Intelligent construction photography, not just pretty pictures
Our expert tells how to organize construction progress photos so you don’t lose track of all the valuable information they contain.
| Mar 1, 2012
AIA: A clear difference, new developments in load-bearing glass
Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Mar 1, 2012
8 tips for architects to consider before LED installation
Lighting experts offer Building Team members critical information to consider before upgrading lighting systems to LEDs.
| Mar 1, 2012
Reconstruction Awards: Reinvesting in a neighborhood’s future
The reconstruction of a near-century-old derelict public works facility in Minneapolis earns LEED Platinum—and the hearts and minds of the neighboring community.
| Mar 1, 2012
7 keys to ‘Highest value, lowest cost’ for healthcare construction
The healthcare design and construction picture has been muddied by uncertainty over the new healthcare law. Hospital systems are in a bind, not knowing what levels of reimbursement to expect. Building Teams serving this sector will have to work even harder to meet growing client demands.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.