flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A soccer team’s fan base could play an integral role in its new stadium’s design and operations

Sports and Recreational Facilities

A soccer team’s fan base could play an integral role in its new stadium’s design and operations

Sacramento Republic FC and HNTB are conducting a contest where the public can submit concept ideas.


By John Caulfield, Senior Editor | September 27, 2017

A 20,000-seat soccer stadium in downtown Sacramento is being designed with significant input by the local community through an outreach initiative launched by the city's pro soccer club and the project's architect. Image: HNTB

AEC firms and their clients constantly talk about the importance of  “community engagement” to the success of their projects.

In Sacramento, Calif., a new soccer stadium is walking the talk. On September 19, Sacramento Republic FC, a local professional soccer team, and HNTB, the architectural firm Sac Republic hired to design its new $245 million, 20,000-seat stadium, launched a “Citizen Architect” competition that invites the public to submit design concepts for sections of the 409,000-sf stadium and its surrounding plaza.

Ben Gumpert, COO of Sac Soccer & Entertainment, the team’s holding company, tells BD+C that the contest designates three areas for which contestants can submit ideas: the stadium’s “front door” on its west side, which includes a huge promenade and access to light rail service (the stadium would be built on 14.9 downtown acres that include the former Sacramento Railyards); the North Plaza, which Gumpert says would be a large “gathering place” for fans; and the Main Concourse, which wraps around three sides of the building.  

 

 

Sac Republic FC's Citizen Architect contest gives the public a chance to influence the design and operation of three areas of the new stadium (colored red in the above rendering). Image: Sacramento Republic FC

 

Submissions and collateral materials can be entered through a new website (https://mls.sacrepublicfc.com) until October 27, and must meet specific criteria for feasibility, creativity, and community. Gumpert notes, however, that the criteria do not include budgetary limitations. “We want to leave all possibilities open,” he explains. A panel of judges that includes HNTB will announce the winning entry on November 7.

Sacramento is one of a dozen cities vying for two expansion slots in Major League Soccer, the highest professional-level league in the U.S. Since 2014 Sacramento Republic FC has played in the western conference of the United Soccer League. MLS is expected to choose its two expansion cities in December, with those teams scheduled to start playing in that league in 2020. Gumpert says that Sacramento is the only city under consideration that is far enough along on its new stadium plans meet MSL’s proposed timetable.

The Building Team on the new stadium includes general contractor Turner Construction, which has already started preconstruction on this project; and ICON Venue Group, which is the project manager.

 

 

A rendering of the stadium's North Plaza, along 8th Street in Sacramento, which is expected to be a major fan gathering spot. Image: HNTB

 

HNTB’s initial design concept for the stadium was informed by fan input from a web survey. And the Citizen Architect contest is one of five pillars of the #BringItHome initiative that Sac Republic FC launched in May to catalyze the community’s support for this project. (Last December, the Sacramento City Council voted 8-0 to approve the construction of this privately financed stadium.)

The initiative's goals include connecting directly with 20,000 fams and local residents through town halls, surveys, forums, focus groups, and one-on-one conversations to ensure the community guides the future of the club. The initiative also calls for “strong participation” by local workers and businesses in the construction and operation of the stadium; concession partnerships with local farms, restaurants, and breweries; and ensuring that there is fan representation with the operation's Board of Directors.

Related Stories

| Apr 12, 2013

Chicago rail conversion puts local twist on High Line strategy

Plans are moving forward to convert an unused, century-old Chicago rail artery to a 2.7 mile, 13 acre recreational facility and transit corridor.

Building Enclosure Systems | Mar 13, 2013

5 novel architectural applications for metal mesh screen systems

From folding façades to colorful LED displays, these fantastical projects show off the architectural possibilities of wire mesh and perforated metal panel technology.

| Mar 5, 2013

Recycled recreation: Waste-to-energy plant combines with ski resort

A new project near Copenhagen pushes the boundaries of the term "mixed use," combining a waste-to-energy plant with a ski resort.

| Feb 22, 2013

Westlake Reed Leskosky will renovate training center for Cleveland Browns

Local firm Westlake Reed Leskosky has been chosen to design renovations to the Cleveland Browns' Training and Administrative Complex in Berea, Ohio.

| Feb 14, 2013

Brasfield & Gorrie breaks ground on New College Football Hall of Fame in Atlanta

General contractor Brasfield & Gorrie is scheduled to kick off construction on the new College Football Hall of Fame in downtown Atlanta. With an anticipated completion date of fall 2014, the $66.5 million project will continue the revitalization of the city’s tourist district.

| Feb 6, 2013

George W. Bush Presidential Center among award-winning roofing projects honored by Sika Sarnafil

Winners of the 2012 Contractor Project of the Year Competition were announced this week by Sika Sarnafil. The annual competition highlights excellence in roofing installation. Roofing contractors are judged based on project complexity, design uniqueness, craftsmanship, and creative problem solving.

| Dec 5, 2012

McIntyre appointed Business Development Director for Shawmut’s Sports Venue Group

McIntyre will be tasked with expanding existing client relationships and creating new partnerships.

| Dec 4, 2012

Wagner joins Ghafari as Manager of Structural Engineering

Wagner comes to Ghafari from Walter P Moore, where he served as a principal, chaired the construction administration task force and led the design of numerous projects ranging in size from $10 million to $70 million.

boombox1
boombox2
native1

More In Category




Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021