flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Snøhetta releases final plan for terraced central library in Calgary

Snøhetta releases final plan for terraced central library in Calgary

The building lifts to form a wooden-faced, arching entry that connects pedestrians from neighboring buildings and a new public plaza.


By BD+C Staff | September 29, 2014
Renderings courtesy Snhetta
Renderings courtesy Snhetta

The competition-winning New Central Library in Calgary is in the final design stages, after two years of community engagement on the part of design firms Snøhetta and DIALOG. The new library is designed to be a “technologically advanced public space for innovation, research, and collaboration,” according to Arch Daily. 

The design is inspired by the nearby foothills, according to Snøhetta, creating a terraced building that extends over an existing light rail transit line that crosses the site. The building lifts to form a wooden-faced, arching entry that connects pedestrians from neighboring buildings and a new public plaza. 

Fritted glass openings on the exterior are transparent to encourage pedestrians to enter the facility. The large and naturally-lit atrium lets visitors see bits and pieces of the overall library, enticing newcomers to explore.

Public programs will be organized at the ground and lower levels, with quieter study areas on the upper floors.

The new library is set to be finished in 2018.

 

 

Related Stories

| Dec 8, 2011

Keast & Hood Co. part of Statue of Liberty renovation team

Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty. 

| Dec 8, 2011

HDR opens office in Shanghai

The office, located in the Chong Hing Finance Center in Shanghai’s busy Huangpu District, will support HDR’s design efforts throughout Asia. 

| Dec 8, 2011

HOK elevates the green office standard

Firm achieves LEED Platinum certification in New York office that overlooks Bryant Park.

| Dec 7, 2011

ACE Mentor Program receives Presidential Award for Excellence in Science, Math and Engineering Mentoring

Thornton Tomasetti founding principal Charles H. Thornton responsible for launching ACE.

| Dec 7, 2011

NSF International qualifies first wallcoverings distributor to the New American National Standard for Sustainable Wallcoverings

TRI-KES demonstrates leadership in environmental stewardship as the first distributor to earn qualification.

| Dec 7, 2011

DPR Foundation awards $590,000 to youth organizations

Grants will fund programs for disadvantaged kids across six states.

| Dec 7, 2011

Autodesk agrees to acquire Horizontal Systems

Acquisition extends and accelerates cloud-based BIM solutions for collaboration, data, and lifecycle management.

| Dec 7, 2011

ICS Builders and BKSK Architects complete St. Hilda’s House in Manhattan

The facility's design highlights the inherent link between environmental consciousness and religious reverence.

| Dec 6, 2011

Construction industry leaders gather for forum on diversity

Declared a “groundbreaking” event for the industry, Gilbane’s First Annual National Partners Council Forum addressed diversity and inclusion as well as building partnerships with minority, veteran, and women-owned businesses.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021