flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Snøhetta releases final plan for terraced central library in Calgary

Snøhetta releases final plan for terraced central library in Calgary

The building lifts to form a wooden-faced, arching entry that connects pedestrians from neighboring buildings and a new public plaza.


By BD+C Staff | September 29, 2014
Renderings courtesy Snhetta
Renderings courtesy Snhetta

The competition-winning New Central Library in Calgary is in the final design stages, after two years of community engagement on the part of design firms Snøhetta and DIALOG. The new library is designed to be a “technologically advanced public space for innovation, research, and collaboration,” according to Arch Daily. 

The design is inspired by the nearby foothills, according to Snøhetta, creating a terraced building that extends over an existing light rail transit line that crosses the site. The building lifts to form a wooden-faced, arching entry that connects pedestrians from neighboring buildings and a new public plaza. 

Fritted glass openings on the exterior are transparent to encourage pedestrians to enter the facility. The large and naturally-lit atrium lets visitors see bits and pieces of the overall library, enticing newcomers to explore.

Public programs will be organized at the ground and lower levels, with quieter study areas on the upper floors.

The new library is set to be finished in 2018.

 

 

Related Stories

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 27, 2012

CSM Group names Comerford as senior project manager

Comerford’s responsibilities include directing and verifying contract compliance by the trade contractors to ensure the owner’s expectations are met in respect to a quality finished project.

| Apr 27, 2012

Hampton Bays Middle School winner of the first National Green Ribbon Schools Program

School was the first LEED-certified public school in the state of New York.

| Apr 26, 2012

USGBC announces inaugural Green Apple Day of Service

On Sept. 29, 2012, participants from all over the world will volunteer to make the schools and campuses in their communities healthier and more sustainable.

| Apr 26, 2012

Gensler's Leiserowitz: Employs holistic philosophy to foster clients' creativity, comfort

Leiserowitz became regional managing principal in Chicago for San Francisco-based architecture and design giant Gensler a little more than a year ago.

| Apr 26, 2012

Blackney Hayes Architects launches new engineering division

The new division, BHH Engineers, will be led by Mark Hershman, PE.

| Apr 26, 2012

Energy efficiency requirements heighten the importance of proper protection for roofing systems

Now more than ever, a well-insulated and well protected roof is critical in new or renovated commercial buildings.

| Apr 26, 2012

Orange County, Fla. high school receives NAIOP “Public Development of the Year” award

School replacement designed by SchenkelShultz Architecture and constructed by Williams Co.

| Apr 25, 2012

Bubble skyscraper design aims to purify drinking water

The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration

| Apr 25, 2012

Thornton Tomasetti/Fore Solutions provides consulting for Biologics Support Center

Project receives LEED Gold Certification.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021