The new Hunt Library at North Carolina State University, Raleigh, incorporates advanced building features, including a five-story robotic bookBot automatic retrieval system that holds 2 million volumes in reduced space. The technology shaved 200,000 square feet off the overall size of the 221,000-sf building, which also includes a large-scale visualization lab (the "Game Lab") that supports NCSU's Digital Games Research Center. Additional technologies include a 3D printing workship and extensive digital media production facilities, plus sophisticated videoconferencing and telepresence infrastructure. A submarine simulator, developed in cooperation with the U.S. Navy, supports ROTC students.
The LEED Silver design incorporates rain gardens and green roofs, as well as active chilled beams and radiant panels for heating and cooling. The contemporary façade combines fritted glass and a fixed aluminum shading system.
In addition to design architect Snøhetta, the Building Team included Pearce Brinkley Cease + Lee (executive architect, LEED administrator); Affiliated Engineers Inc. (MEP, FP); Stewart Engineering (SE); Arup (structural consultant); ColeJenest & Stone (CE); and Skanska (CM).
(http://www.archdaily.com/354701/hunt-library-snohetta/)
Related Stories
| Dec 8, 2011
HOK elevates the green office standard
Firm achieves LEED Platinum certification in New York office that overlooks Bryant Park.
| Dec 7, 2011
ACE Mentor Program receives Presidential Award for Excellence in Science, Math and Engineering Mentoring
Thornton Tomasetti founding principal Charles H. Thornton responsible for launching ACE.
| Dec 7, 2011
NSF International qualifies first wallcoverings distributor to the New American National Standard for Sustainable Wallcoverings
TRI-KES demonstrates leadership in environmental stewardship as the first distributor to earn qualification.
| Dec 7, 2011
DPR Foundation awards $590,000 to youth organizations
Grants will fund programs for disadvantaged kids across six states.
| Dec 7, 2011
Autodesk agrees to acquire Horizontal Systems
Acquisition extends and accelerates cloud-based BIM solutions for collaboration, data, and lifecycle management.
| Dec 7, 2011
ICS Builders and BKSK Architects complete St. Hilda’s House in Manhattan
The facility's design highlights the inherent link between environmental consciousness and religious reverence.
| Dec 6, 2011
Construction industry leaders gather for forum on diversity
Declared a “groundbreaking” event for the industry, Gilbane’s First Annual National Partners Council Forum addressed diversity and inclusion as well as building partnerships with minority, veteran, and women-owned businesses.
| Dec 6, 2011
Mortenson Construction completes Elk Wind Project in Iowa
By the end of 2011, Mortenson will have built 17 wind projects in the state generating a total of 1894 megawatts of renewable power.
| Dec 6, 2011
?ThyssenKrupp acquires Sterling Elevators Services
The acquisition of Sterling Elevator Services Corporation is the third acquisition completed by ThyssenKrupp Elevator AG in the last three months in North America.
| Dec 6, 2011
Vivenzio named vice president of building performance practice at Thornton Tomasetti’s New York Office
Vivenzio, a licensed architect in New York and New Jersey, has more than 28 years of experience in architectural project management, construction administration, building diagnostic services and forensic investigation.