The new Hunt Library at North Carolina State University, Raleigh, incorporates advanced building features, including a five-story robotic bookBot automatic retrieval system that holds 2 million volumes in reduced space. The technology shaved 200,000 square feet off the overall size of the 221,000-sf building, which also includes a large-scale visualization lab (the "Game Lab") that supports NCSU's Digital Games Research Center. Additional technologies include a 3D printing workship and extensive digital media production facilities, plus sophisticated videoconferencing and telepresence infrastructure. A submarine simulator, developed in cooperation with the U.S. Navy, supports ROTC students.
The LEED Silver design incorporates rain gardens and green roofs, as well as active chilled beams and radiant panels for heating and cooling. The contemporary façade combines fritted glass and a fixed aluminum shading system.
In addition to design architect Snøhetta, the Building Team included Pearce Brinkley Cease + Lee (executive architect, LEED administrator); Affiliated Engineers Inc. (MEP, FP); Stewart Engineering (SE); Arup (structural consultant); ColeJenest & Stone (CE); and Skanska (CM).
(http://www.archdaily.com/354701/hunt-library-snohetta/)
Related Stories
| May 1, 2012
Construction is underway on MLK ambulatory care center in L.A.
Featuring a variety of sustainable features, the new facility is designed to achieve LEED Gold Certification.
| Apr 30, 2012
Virginia Commonwealth unveils design for Arts Institution
Institute for Contemporary Art will serve as a catalyst for exhibitions, programs, research and collaboration.
| Apr 30, 2012
Summit Design + Build completes build-out for Office Concepts
The project is seeking LEED ID Silver certification from the U.S. Green Building Council.
| Apr 30, 2012
HSA Commercial selected as consultant for Orland Park’s Main Street Triangle project
HSA will be responsible for designing an overall mixed-use merchandise plan, attracting a unique retail tenant mix and completing leases with prospective tenants.
| Apr 30, 2012
Gilbane to manage retrofit of the Fraunhofer CSE R&B structure
Building is a first-of-its-kind research and demonstration building for sustainable technologies in Boston's Innovation District.
| Apr 30, 2012
KBE Building completes renovation at the ConnCAT
The $1.2 million project consisted of a 16,000-sf interior renovation.
| Apr 27, 2012
GreenExpo365.com to offer webinars on EPA’s WaterSense Program
Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.
| Apr 27, 2012
APA launches wood design web portal for building and design pros
Design professionals who are members of APA’s Professional Associates are automatically enrolled in the APA Designers Circle program.
| Apr 27, 2012
China Mobile selects Leo A Daly to design three buildings at its new HQ
LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.
| Apr 27, 2012
CSM Group names Comerford as senior project manager
Comerford’s responsibilities include directing and verifying contract compliance by the trade contractors to ensure the owner’s expectations are met in respect to a quality finished project.