The new Hunt Library at North Carolina State University, Raleigh, incorporates advanced building features, including a five-story robotic bookBot automatic retrieval system that holds 2 million volumes in reduced space. The technology shaved 200,000 square feet off the overall size of the 221,000-sf building, which also includes a large-scale visualization lab (the "Game Lab") that supports NCSU's Digital Games Research Center. Additional technologies include a 3D printing workship and extensive digital media production facilities, plus sophisticated videoconferencing and telepresence infrastructure. A submarine simulator, developed in cooperation with the U.S. Navy, supports ROTC students.
The LEED Silver design incorporates rain gardens and green roofs, as well as active chilled beams and radiant panels for heating and cooling. The contemporary façade combines fritted glass and a fixed aluminum shading system.
In addition to design architect Snøhetta, the Building Team included Pearce Brinkley Cease + Lee (executive architect, LEED administrator); Affiliated Engineers Inc. (MEP, FP); Stewart Engineering (SE); Arup (structural consultant); ColeJenest & Stone (CE); and Skanska (CM).
(http://www.archdaily.com/354701/hunt-library-snohetta/)
Related Stories
| Feb 11, 2013
AIA elevates 122 members and seven international architects to the College of Fellows
The 2013 Jury of Fellows from the American Institute of Architects (AIA) elevated 122 AIA members to its prestigious College of Fellows, an honor awarded to members who have made significant contributions to the profession. The 2013 Fellows will be honored at an investiture ceremony at the 2013 National AIA Convention and Design Exposition in Denver.
| Feb 8, 2013
5 factors to consider when designing a shade system
Designing a shade system is more complex than picking out basic white venetian blinds. Here are five elements to consider when designing an interior shade system.
| Feb 8, 2013
Isabella Stewart Gardner Museum’s new wing voted Boston’s 'most beautiful new building'
Bostonians voted the Isabella Stewart Gardner Museum's new wing the People's Choice Award winner for 2012, honoring the project as the city's "most beautiful new building" for the calendar year. The new wing, designed by Renzo Piano and Stantec, beat out three other projects on the short list.
| Feb 6, 2013
Arcadia (Calif.) High School opens $20 million performing arts center
A 60-year old wish for the community of Arcadia has finally come true with the opening of Arcadia Unified School District’s new $20 million Performing Arts Center.
| Feb 6, 2013
CSI: Revitalizing the brand to achieve the mission
CSI is revitalizing its brand as part of its continued pursuit of its mission: improving facility performance through better communication in the commercial-level construction industry.
| Feb 5, 2013
8 eye-popping wood building projects
From 100-foot roof spans to novel reclaimed wood installations, the winners of the 2013 National Wood Design Awards push the envelope in wood design.
| Feb 3, 2013
Electronic surveying improves accuracy on BIM-driven hospital project
A mechanical contractor combines an electronic surveying tool with a BIM model to make significant productivity gains in a large-scale hospital project.