flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Smyrna Ready Mix’s new office HQ mimics the patterns in the company’s onsite stone quarry

Office Buildings

Smyrna Ready Mix’s new office HQ mimics the patterns in the company’s onsite stone quarry

The five-story, 85,000-sf Nashville building draws design inspiration from the concrete company’s materials and processes.


By Novid Parsi, Contributing Editor | February 12, 2023
Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects
All photos courtesy EOA Architects

In 1999, Tennessee concrete company Smyrna Ready Mix started off with just three trucks. Since then, it has grown to 5,400 employees in 16 states. Last year, the company moved from its small office in downtown Nashville to its new corporate headquarters on an 800-acre site. 

Designed by EOA Architects to showcase various concrete processes and applications, the five-story, 85,000-sf building’s vertical layering mimics the patterns in the company’s stone quarry, located on the opposite end of the campus site. The building’s glass and concrete bands are meant to mirror the quarry’s natural contours and striations. 

Inside, the helix of the building’s circulation patterns draws inspiration from the shape of a concrete mixing truck drum. Exposed concrete walls extend unobstructed from the first through fifth floors. The shear wall, the elevator, and the stair cores are 18-inch-thick poured walls with a custom radius, minimizing the amount of finishing work needed post-pour.

The interior design also references the company’s brand and industry. Custom-designed light fixtures echo the forms of concrete drums. The steps’ curved underside nods to the supply chutes used to pour concrete from the mixing drum. In the training room, the wet bar’s backsplash has been made with repurposed test cylinders, which are used to determine the strength of a mixed concrete batch. Furniture and textiles incorporate the red, white, and blue colors of the company’s logo.

The project also features corporate amenities for onsite staff and drivers, including dining, a fitness facility, training and community rooms, and a daycare center for 100 of the company and community’s children. Future plans for the campus include walking paths.

On the Building Team:
Owner: SRM Concrete
Design architect: EOA Architects
Architect of record: EOA Architects
MEP engineer: I.C. Thomasson Associates
Structural engineer: EMC Structural Engineers
General contractor/construction manager: DPR Construction

Here is the design statement from EOA Architects:
Smyrna Ready Mix is a family-owned and operated concrete company founded in Smyrna, Tennessee in 1999. Beginning with only three trucks, the company has grown to 5,400 employees in 16 states. This dramatic expansion meant it was time to move from a cramped office in downtown Nashville to a new corporate headquarters on an 800-acre site near an interstate interchange just south of the city. Here, the new building will help anchor a new mixed-use development, provide a landmark for a new corporate campus and help definite this gateway to the town of Smyrna.

Office Building as Billboard

Designed to showcase the varied types of concrete processes and applications, the vertical layering of the five-story building mimics the rhythms found in the company’s stone quarry, also located on the site. The building profile rises at the opposite end the site from the sunken quarry, creating an inverse relationship that guides the design. The building’s floor plate pushes and pulls to create an organic form with glass and concrete bands mirroring the quarry’s natural contours and striations. 

Full glazing takes advantage of surrounding views and showcases the structural components, including numerous types of concrete and finishing styles. Slender 16-inch diameter columns made of a high-strength concrete mix balance on elegant bases tapered to 10 inches at the first floor and do the work of a typical 24-inch column. Cantilevered post-tension slabs demonstrate the material’s sculptural possibilities. The building contains no 90-degree edges; everything is rounded, creating a dynamic flow that further reinforces concrete’s versatility.  

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Workplace design uses lightness, movement

EOA steered away from a brutalist concrete expression to emphasize light and lightness and create a warm and welcoming environment. Users enter the building through three large concrete fins that provide the framework for the entry vestibules. The lobby floor is a custom concrete mix developed by EOA and SRM that resembles terrazzo. The lobby’s material palate adds a vertical oak motif complemented by  champagne colored metal ceilings and railings. A double cantilevered concrete stair anchored in front of the exposed double-height concrete shear wall cascades gracefully into the lobby space, establishing the sense of open movement that permeates the building.

Inspired by the shape of a concrete mixing truck drum, the design incorporates an internal helix into the building’s circulation patterns. Vertical circulation is highlighted through the use of exposed concrete walls that extend unobstructed from the first through fifth floors. The shear wall, as well as the elevator and stair cores are 18-inch-thick poured walls with a custom radius to soften the edges and minimize the amount of finishing work required post-pour. These elements were left in a natural sculptural state with only a matte finish sealer applied to allow the form-work joints to cast shadows as sunlight moves through the space. 

Artful connections to the company's brand and industry infuse the interiors: Custom designed light fixtures echo the forms of concrete drums.  The curved underside of the monumental steps is a nod to the supply chutes used to pour concrete from the mixing drum. In the training room, test cylinders, used to determine the strength of each mixed concrete batch, were cut and re-purposed as the backsplash of the training room wet bar. Furniture and textiles subtly incorporate the red, white and blue colors of the company's logo.

Office building supports family business, community vision

The family had a specific and progressive vision for its new home. It was important to them to invite the community into the building and onto the campus,  which includes a historic community cemetery. Future plans include walking paths to create a larger, healthy holistic environment. The project also prioritized unprecedented corporate amenities for both on-site staff as well as drivers: the first floor includes on-site dining, a fitness facility, training and community rooms as well as a daycare center for 100 of the company and community’s children. 

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

Smyrna Ready Mix corporate headquarters EOA Architects DRP Construction Photo courtesy EOA Architects

 

 

 

 

 

 

 

 

Related Stories

| Oct 18, 2011

Dow Building Solutions invests in two research facilities to deliver data to building and construction industry

  State-of-the-art monitoring system allows researchers to collect, analyze and process the performance of wall systems.

| Oct 17, 2011

Big D Floor covering supplies to offer Johnsonite Products??

Strategic partnership expands offering to south and west coast customers. 

| Oct 17, 2011

Schneider Electric introduces UL924 emergency lighting control devices

The emergency lighting control devices require fewer maintenance costs and testing requirements than backup batteries because they comply with the UL924 standard, reducing installation time. 

| Oct 14, 2011

AISC develops new interoperability strategy to move construction industry forward

AISC is working to bring that vision to reality by developing a three-step interoperability strategy to evaluate data exchanges and integrate structural steel information into buildingSMART's Industry Foundation Classes.

| Oct 12, 2011

Vertical Transportation Systems Reach New Heights

Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently. 

| Oct 12, 2011

Building a Double Wall

An aged federal building gets wrapped in a new double wall glass skin.

Office Buildings | Oct 12, 2011

8 Must-know Trends in Office Fitouts

Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.

| Oct 12, 2011

FMI’s Construction Outlook: Third Quarter 2011 Report

  Construction Market Forecast: The general economy is seeing mixed signs.

| Oct 11, 2011

Pink light bulbs donated to Society of Memorial Sloan-Kettering Cancer Center

  For every Bulbrite Pink Light Bulb that is purchased through the Cancer Center Thrift Shop, 100% of the proceeds will be donated to help support breast cancer research, education, screening, and treatment. 

| Oct 11, 2011

ThyssenKrupp elevator cabs validated by UL Environment

The conclusive and independent third-party validation process is another step toward a green product line.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021