flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SmithGroupJJR opens office in Shanghai, China

SmithGroupJJR opens office in Shanghai, China

The firm will focus on several of China’s biggest growth markets: research and development, healthcare, continuing care/retirement communities, and higher education. 


By SmithGroupJJR | December 4, 2013
The new office follows a number of significant projects SmithGroupJJR has design
The new office follows a number of significant projects SmithGroupJJR has designed in China in recent years, including the new 5

SmithGroupJJR, the oldest architecture and engineering firm in the U.S., has opened an office in Shanghai, China.  

The 160-year-old SmithGroupJJR, known for its award-winning designs and integrated services, will focus on several of China’s biggest growth markets: research and development, healthcare, continuing care/retirement communities, and higher education.  

The new office follows a number of significant projects SmithGroupJJR has designed in China in recent years, serving Chinese clients and U.S-based companies expanding their operations to China.  In Changchun, the firm designed the new 468,000-square-meter (5.0 million square feet) automotive research and development center for First Automotive Works, China’s leading manufacturer of passenger cars and commercial trucks and buses. Now under construction, the project will be completed in 2015. 

Continuing care/retirement community design is another area of expertise successfully brought to China by SmithGroupJJR.  Starting construction this fall in Shanghai is the 21-story ZhongShan Park, a continuing care retirement community SmithGroupJJR designed for the Vcanland Senior Living Group.

Leading SmithGroupJJR’s China operations is Russ Sykes, a 28-year veteran of the firm.  Sykes is dividing his time between Shanghai and the SmithGroupJJR office in Detroit, Mich., where he’s spent most of his career.

“Many of our China-based clients, like First Automotive Works, traveled to the U.S and sought us out for our specialized design expertise,” Sykes said. “Now, with the new office, our clients in Shanghai have direct access to our services. Simultaneously, they benefit from the alliances we’ve established and our understanding of how to work in China,” Sykes added     .

SmithGroupJJR President & CEO Carl Roehling believes the growing healthcare market in China will help the firm succeed.

“Clients are requesting the level of design expertise we possess,” Roehling said. “For the growing healthcare market in China, there is a need for firms that excel in healthcare design and the advanced technology used in hospitals. We have that expertise,” he added.

SmithGroupJJR is ranked as the10th largest healthcare design firm in the world by the 2013 edition of World Architecture 100, published by Building Design magazine. In Shanghai, SmithGroupJJR designed Shuguang Hospital for Shanghai Traditional Chinese Medical University. The firm’s U.S. clients include the National Institutes of Health, St. Jude Children’s Research Hospital, Stanford University Medical Center, and Kaiser Permanente.

SmithGroupJJR’s China office is located in the Puxi area of Shanghai. The address is Suite A409, Tomorrow Square, 399 W. Nanjing Road, Shanghai, 200003.  The phone number is 86 21 2308 1188.

About SmithGroupJJR
SmithGroupJJR is the oldest continually operating architecture and engineering firm in the U.S., founded in 1853.  The firm consistently ranks top 10 in the U.S in the primary client markets it serves: healthcare, science & technology, higher education and workplace.  A leader in sustainable design, SmithGroupJJR has completed 91 LEED certified projects to- date. The firm’s U.S. offices are located in Ann Arbor, MI; Chicago, IL; Dallas, TX; Detroit, MI; Madison, WI; Los Angeles, CA; Phoenix, AZ; San Francisco, CA; and Washington, DC.

Related Stories

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

boombox1
boombox2
native1

More In Category



Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021