flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SmithGroupJJR hires Lise Newman as Workplace Studio Leader in Detroit

SmithGroupJJR hires Lise Newman as Workplace Studio Leader in Detroit


By SmithGroup | April 25, 2013

SmithGroupJJR, one of the nation's largest architecture, engineering and planning firms, has hired architect Lise Newman, AIA, as Workplace Studio leader at its Detroit, Mich. office.

Newman comes to SmithGroupJJR after serving as part owner and principal-in-charge of design at Landry + Newman ARCHITECTURE in Birmingham, Mich.  In her new role at SmithGroupJJR, Newman will work closely with Detroit and corporate leadership in business development and marketing efforts as well as leading local, regional and national projects.

Newman’s 25-year career has been dedicated to the programming, planning and design of corporate, educational and recreational facilities.  Her most notable projects, all in Michigan, include the 120,000-square-foot Mercedes-Benz Financial Headquarters, Farmington Hills; the 320,000-square-foot Trinity Health Corporate Headquarters, Livonia; and the 100,000-square-foot Corporate Headquarters for Taubman Centers, Inc., Bloomfield Hills.  In addition to Michigan, Newman is a licensed architect in California. 

“Lise brings to the table the ‘big picture’ of design possibilities for our clients.  With her experience running her own firm, Lise’s business acumen is very high.  Technically, her programming and planning skills are the best in the business,” remarked Jeff Hausman, AIA, LEED AP, director of SmithGroupJJR’s Detroit office. 

Newman graduated with a Bachelor of Architecture degree from the University of Texas at Austin.  This was preceded by an undergraduate study in business administration from Trinity University, San Antonio, Texas.  Among her professional affiliations are the American Institute of Architects Michigan (AIAMI) and Commercial Real Estate Women (CREW), Detroit chapter.

SmithGroupJJR (www.smithgroupjjr.com) is ranked a Top 10 design firm by Architect, the magazine of the American Institute of Architects. Its staff numbers 800 employees in 10 offices across the U.S.  A national leader in sustainable design, SmithGroupJJR has 343 LEED professionals and 81 LEED certified projects.

Related Stories

| Sep 13, 2010

Second Time Around

A Building Team preserves the historic facade of a Broadway theater en route to creating the first green playhouse on the Great White Way.

| Sep 13, 2010

Palos Community Hospital plans upgrades, expansion

A laboratory, pharmacy, critical care unit, perioperative services, and 192 new patient beds are part of Palos (Ill.) Community Hospital's 617,500-sf expansion and renovation.

| Sep 13, 2010

China's largest single-phase hospital planned for Shanghai

RTKL's Los Angles office is designing the Shanghai Changzheng New Pudong Hospital, which will be the largest new hospital built in China in a single phase.

| Sep 13, 2010

Richmond living/learning complex targets LEED Silver

The 162,000-sf living/learning complex includes a residence hall with 122 units for 459 students with a study center on the ground level and communal and study spaces on each of the residential levels. The project is targeting LEED Silver.

| Sep 13, 2010

World's busiest land port also to be its greenest

A larger, more efficient, and supergreen border crossing facility is planned for the San Ysidro (Calif.) Port of Entry to better handle the more than 100,000 people who cross the U.S.-Mexico border there each day.

| Sep 13, 2010

Triple-LEED for Engineering Firm's HQ

With more than 250 LEED projects in the works, Enermodal Engineering is Canada's most prolific green building consulting firm. In 2007, with the firm outgrowing its home office in Kitchener, Ont., the decision was made go all out with a new green building. The goal: triple Platinum for New Construction, Commercial Interiors, and Existing Buildings: O&M.

| Sep 13, 2010

Stadium Scores Big with Cowboys' Fans

Jerry Jones, controversial billionaire owner of the Dallas Cowboys, wanted the team's new stadium in Arlington, Texas, to really amp up the fan experience. The organization spent $1.2 billion building a massive three-million-sf arena that seats 80,000 (with room for another 20,000) and has more than 300 private suites, some at field level-a first for an NFL stadium.

| Sep 13, 2010

'A Model for the Entire Industry'

How a university and its Building Team forged a relationship with 'the toughest building authority in the country' to bring a replacement hospital in early and under budget.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021