SmithGroupJJR, one of the nation's largest architecture, engineering and planning firms, has hired architect Lise Newman, AIA, as Workplace Studio leader at its Detroit, Mich. office.
Newman comes to SmithGroupJJR after serving as part owner and principal-in-charge of design at Landry + Newman ARCHITECTURE in Birmingham, Mich. In her new role at SmithGroupJJR, Newman will work closely with Detroit and corporate leadership in business development and marketing efforts as well as leading local, regional and national projects.
Newman’s 25-year career has been dedicated to the programming, planning and design of corporate, educational and recreational facilities. Her most notable projects, all in Michigan, include the 120,000-square-foot Mercedes-Benz Financial Headquarters, Farmington Hills; the 320,000-square-foot Trinity Health Corporate Headquarters, Livonia; and the 100,000-square-foot Corporate Headquarters for Taubman Centers, Inc., Bloomfield Hills. In addition to Michigan, Newman is a licensed architect in California.
“Lise brings to the table the ‘big picture’ of design possibilities for our clients. With her experience running her own firm, Lise’s business acumen is very high. Technically, her programming and planning skills are the best in the business,” remarked Jeff Hausman, AIA, LEED AP, director of SmithGroupJJR’s Detroit office.
Newman graduated with a Bachelor of Architecture degree from the University of Texas at Austin. This was preceded by an undergraduate study in business administration from Trinity University, San Antonio, Texas. Among her professional affiliations are the American Institute of Architects Michigan (AIAMI) and Commercial Real Estate Women (CREW), Detroit chapter.
SmithGroupJJR (www.smithgroupjjr.com) is ranked a Top 10 design firm by Architect, the magazine of the American Institute of Architects. Its staff numbers 800 employees in 10 offices across the U.S. A national leader in sustainable design, SmithGroupJJR has 343 LEED professionals and 81 LEED certified projects.
Related Stories
| May 10, 2012
Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond
Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.
| May 10, 2012
Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction
Certification for existing buildings under these two rating programs has overtaken that for new construction.
| May 10, 2012
Chapter 4 Business Case for High-Performance Reconstructed Buildings
Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.
| May 10, 2012
Chapter 3 How Building Technologies Contribute to Reconstruction Advances
Building Teams are employing a wide variety of components and systems in their reconstruction projects.
| May 10, 2012
Chapter 2 Exemplary High-Performance Reconstruction Projects
Several case studies show how to successfully renovate existing structures into high-performance buildings.
| May 9, 2012
Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings
As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.
| May 9, 2012
International green building speaker to keynote Australia’s largest building systems trade show
Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.
| May 9, 2012
Tishman delivers Revel six weeks early
Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.
| May 9, 2012
Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award
Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.
| May 9, 2012
Shepley Bulfinch given IIDA Design award for Woodruff Library?
The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.