flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SmithGroup to design new Univ. of Colorado Denver engineering, design, computing building

University Buildings

SmithGroup to design new Univ. of Colorado Denver engineering, design, computing building

The building will serve as anchor of new downtown innovation district.


By Peter Fabris, Contributing Editor | April 18, 2022
CU Denver engineering, design and computing building
The University of Colorado Denver selected SmithGroup to design a new engineering, design, and computing building that will serve as anchor of new downtown innovation district. Courtesy SmitthGroup.

The University of Colorado Denver selected SmithGroup to design a new engineering, design, and computing building that will serve as anchor of new downtown innovation district. The project is part of a major goal of CU Denver’s visionary 2030 Strategic Plan to cultivate new technology, partnerships, programming, diverse talent, and in-demand jobs in one hub located in the heart of Denver, according to a university press release.
 
The building will support research in key areas like artificial intelligence, cybersecurity, and robotics. This work will be focused on areas where emerging technologies are transformative such as health, construction, manufacturing, cities, and space. Chancellor Michelle Marks said the project will bolster the Speer Boulevard corridor, and help create a more equitable engineering education and workforce talent pipeline.

Strategically Designed for Engineering, Design, & Computing 


Martin Dunn, dean of the College of Engineering, Design and Computing (CEDC), said the building will be a gamechanger by serving students with cutting-edge facilities that support computing and design-oriented curricula and pedagogy. “This is essential as technology is changing faster than ever, and industry is asking engineers to do new types of work that require increased creativity, teamwork, and collaboration across disciplines,” Dunn said.
 
The university cited SmithGroup’s alignment with C.U. Denver’s values of diversity, equity, sustainability, and innovation for choosing the firm. SmithGroup aims to involve the campus and community in its planning process.
 
The firm will host a series of town halls to share updates and gather feedback. At the March design team kickoff meeting, Marks left SmithGroup representatives with a bold request: “I want you to do something bigger and better and different than anyone has done before.”
 
Construction is slated to begin in late 2022, with a planned opening before the start of the 2024-25 academic year.
 
Owner and/or developer: University of Colorado Denver
Design architect: SmithGroup
Architect of record: SmithGroup
MEP engineer: SmithGroup
Structural engineer: Martin/Martin Consulting Engineers
General contractor/construction manager: McCarthy Building Companies

Related Stories

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 6, 2012

Joliet Junior College achieves LEED Gold

With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.

| Mar 1, 2012

Cornell shortlists six architectural firms for first building on tech campus

Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

| Feb 14, 2012

Angelo State University opens doors to new recreation center expansion

  Designed by SmithGroup, the JJR_Center for Human Performance offers enhanced fitness options, dynamic gathering space.

| Feb 6, 2012

Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation

Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Feb 2, 2012

Next phase of construction begins on Scripps Prebys Cardiovascular Institute

$456 million Institute will be comprehensive heart center for 21st Century.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021