A cost/benefit analysis by clean energy advisory and venture capital firm Capital E suggests that implementing smart surface solutions in major cities would have multiple resilience and health benefits as well as save money.
Smart surfaces include green roofs, solar panels, permeable pavement, and reflective pavement. The report, “Delivering Urban Resilience,” focused on three cities: El Paso, Texas, Philadelphia, and Washington, DC.
Over 40 years, the three cities would reap savings of $3.6 billion in Philadelphia; $1.8 billion in Washington, D.C.; and $538 million in El Paso. These figures would be realized after factoring in smart surface installation and operational costs.
Smart surfaces would reduce the urban heat island effect, making cities cooler and reducing health threats such as heat stroke and smog during heat waves.
Related Stories
Codes and Standards | Sep 16, 2016
Calm weather tidal flooding impacting several communities on East and Gulf Coasts
Local officials face the prospect of costly mitigation projects.
Codes and Standards | Sep 15, 2016
OSHA appoints new director for its construction directorate
The forty-year industry veteran has been a GC and business owner.
Energy | Sep 13, 2016
Oberlin College to hold conference on post-fossil fuel economy
The gathering will address climate change and new sources of energy.
Industry Research | Sep 12, 2016
Evidence linking classroom design to improved learning mounts
A study finds the impact can be as much as 25% per year.
Legislation | Sep 8, 2016
Half of U.S. states now allow design-build on public projects
Missouri is the latest to enact design-build legislation.
Codes and Standards | Sep 8, 2016
Vapor intrusion risk addressed in new ASTM guide update
The updates address industry confusion over how to handle the issue.
BIM and Information Technology | Sep 7, 2016
Energy Star Portfolio Manager tool updated to factor in waste management
The costs and benefits of managing 29 types of waste are now included.
Wood | Sep 6, 2016
Atlanta suburb prohibits wood-framed construction for high rises
The new building code prevents any structure with more than three stories from being built from a CLT frame.
Codes and Standards | Sep 1, 2016
Overuse of air conditioning hurts office productivity
A study found temperatures in the low 70s reduce worker performance.
Regulations | Aug 31, 2016
FEMA wants to toughen flood regulation on projects using federal funds
The proposal ‘would essentially rewrite the current 100-year flood standard.’