flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

‘Smart retrofitting’ will be crucial to net zero aspirations

Codes and Standards

‘Smart retrofitting’ will be crucial to net zero aspirations

AI, analytical software, Internet of Things are keys to decarbonization of built environment


By Peter Fabris, Contributing Editor | March 10, 2021

Courtesy Pixabay

“Smart retrofitting” that uses data gleaned from artificial intelligence (AI), analytical software, and the Internet of Things (IoT) is critical to achieving net zero buildings, according to new research from construction technology provider Asite.

By 2050, 75% of buildings that exist today will be energy inefficient, making wide-scale energy retrofits essential to the goal of a net zero built environment. A global strategy that incorporates models using data from digital twins—digital representations of assets, processes, and systems—will help optimize retrofit investments, Asite says.

A simulation model can be compared to measured sensor and meter data in a building. “This calibrated model then becomes a digital asset,” the Asite report says. “In the case of retrofitting, digital twins enable the retrospective analysis of existing structures to deliver necessary transformation.”

The report also discusses retrofitting on a global scale, examining government and organization policies and initiatives from around the world.

Related Stories

Codes and Standards | Mar 12, 2018

L.A. mayor proposes mandatory seismic retrofits for steel buildings, daycare centers, private schools

Los Angeles Mayor Eric Garcetti has proposed a seismic retrofit requirement for vulnerable steel buildings built before the 1994 Northridge earthquake.

Codes and Standards | Mar 8, 2018

Net zero commercial building trend shows strong momentum

Almost 50% more zero energy commercial buildings under construction in 2017.

Codes and Standards | Mar 7, 2018

Dept. of Energy says 2016 ANSI/ASHRAE/IES Standard 90.1 would save 8.2% of energy costs

Favorable comparison to 2013 standard for commercial buildings.

Codes and Standards | Mar 6, 2018

Well Living Lab launches extensive study on how indoor environments affect people’s lives

Factors that impact health, performance, stress and resiliency, sleep, and comfort to be scrutinized.

Codes and Standards | Mar 5, 2018

New guide helps planners assess innovation districts

The document is designed to aid in targeting resources toward innovative and inclusive economic development based on an area’s unique strengths and challenges.

Codes and Standards | Mar 1, 2018

Net zero commercial building trend shows strong momentum

Almost 50% more zero energy commercial buildings under construction in 2017.

Codes and Standards | Feb 27, 2018

Smart surface solutions can improve disaster resilience, health and comfort in cities

Stormwater management, water quality, and heat island effect could all be impacted.

Codes and Standards | Feb 26, 2018

Bolstering energy efficiency would produce significant health benefits, ACEEE study says

Reducing energy consumption by 15% would save six lives a day.

Codes and Standards | Feb 22, 2018

GBCI will certify underwriting standard for energy efficiency projects

Investor Ready Energy Efficiency (IREE) certification aims to boost confidence in predicted energy and financial savings.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021