flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Slideshow: New renderings of 1 WTC

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.


By Posted by Tim Gregorski, Senior Editor | August 9, 2012
 One World Trade Center aims to be one of the most sustainable office buildings
One World Trade Center aims to be one of the most sustainable office buildings of its size and to achieve LEED Gold certificati

The Port Authority and The Durst Organization today issued 13 new renderings of One World Trade Center. The two organizations are jointly developing the iconic, 3-million-square-foot office tower now under construction in Lower Manhattan.

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

The building will serve as the headquarters of world-class publisher Condé Nast, which has leased nearly 1.2 million sf on 25 floors. An additional 190,000 sf has been leased by Vantone China Center and another 270,000 sf by the federal General Services Administration—bringing One World Trade Center to 55% leased.

One World Trade Center aims to be one of the most sustainable office buildings of its size and to achieve LEED Gold certification standards. These standards will result in lower energy expenses, lower operating expenses, access to natural light through floor-to-ceiling glass windows and highly filtered air. +

Related Stories

| May 29, 2012

Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos

McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 29, 2012

AIA expands Documents-On-Demand service??

Six new documents added, DOD offers nearly 100 contract documents.  

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.

| May 24, 2012

Construction backlog declines 5.4% in the first quarter of 2012?

The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021