S/L/A/M Collaborative, the national architectural firm based in Glastonbury, Conn., on March 6 completed its acquisition of five Heery architectural design practices from CBRE. The terms of the purchase were not disclosed.
The practices—focused on healthcare, sports facilities, and justice—are now known as Heery Design, a SLAM Studio. CBRE had owned Heery International, a project management and design engineering firm based in Atlanta, since October 2017 when it acquired the business for $57 million from Balfour Beatty. After the deal with S/L/A/M, CBRE retains full ownership of Heery’s interior design and engineering businesses that are integral to its project management services.
About 70 of Heery’s employees are coming over in this deal, joining 210 S/L/A/M professionals. Heery’s healthcare practice is located in Denver, Iowa City, Iowa, and Philadelphia. Its justice practice is in Orlando, Fla. And its sports design practice is in Atlanta. Heery Design offices associated with these practices are also part of this acquisition, along with the firm’s architectural book of business.
“The professionals joining S/L/A/M in this transaction are returning to a traditional design firm that values creativity, and is passionate about design,” said Richard T. Connell, FAIA, S/L/A/M’s chairman, in a prepared statement. Those professionals include Heery Design’s managing directors Russ Sedmak, Mike Holleman, and Douglas Kleppin, AIA, LEED AP.
S/L/A/M’s design portfolio includes healthcare, education, corporate and sports facilities. The firm provides integrated landscape architecture, structural engineering, interior design and construction services, with offices in Connecticut, New York, Atlanta, Boston, and Los Angeles.
A source knowledgeable about this deal, who spoke on background, said that a third party representing CBRE had approached a handful of firms, including S/L/A/M, at the beginning of 2018 about their interest in acquiring parts of Heery. This source said that CBRE was primarily interested in finding a buyer willing to acquire all five of the practices it wanted to shed.
This source adds that what CBRE is holding onto from its Heery purchase is a “much larger” piece than what it is selling to S/L/A/M.
Related Stories
| Feb 15, 2011
New Urbanist Andrés Duany: We need a LEED Brown rating
Andrés Duany advocates a "LEED Brown" rating that would give contractors credit for using traditional but low cost measures that are not easy to quantify or certify. He described these steps as "the original green," and "what we did when we didn't have money." Ostensibly, LEED Brown would be in addition to the current Silver, Gold and Platinum ratings.
| Feb 15, 2011
AIA on President Obama's proposed $1 billion investment in energy conservation
The President’s budget increases the value of investment in energy conservation in commercial buildings by roughly $1 billion, reports AIA 2011 President Clark Manus, FAIA. The significant increase from the current tax deduction of $1.80 per sq. ft. now on the books is an increase for which the AIA has been advocating in order to encourage energy conservation.
| Feb 14, 2011
Sustainable Roofing: A Whole-Building Approach
According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Feb 11, 2011
Four Products That Stand Up to Hurricanes
What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.
| Feb 11, 2011
RS Means Cost Comparison Chart: Office Buildings
This month's RS Means Cost Comparison Chart focuses on office building construction.
| Feb 11, 2011
Sustainable features on the bill for dual-building performing arts center at Soka University of America
The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.
| Feb 11, 2011
BIM-enabled Texas church complex can broadcast services in high-def
After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.
| Feb 11, 2011
Kentucky’s first green adaptive reuse project earns Platinum
(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.