S/L/A/M Collaborative, the national architectural firm based in Glastonbury, Conn., on March 6 completed its acquisition of five Heery architectural design practices from CBRE. The terms of the purchase were not disclosed.
The practices—focused on healthcare, sports facilities, and justice—are now known as Heery Design, a SLAM Studio. CBRE had owned Heery International, a project management and design engineering firm based in Atlanta, since October 2017 when it acquired the business for $57 million from Balfour Beatty. After the deal with S/L/A/M, CBRE retains full ownership of Heery’s interior design and engineering businesses that are integral to its project management services.
About 70 of Heery’s employees are coming over in this deal, joining 210 S/L/A/M professionals. Heery’s healthcare practice is located in Denver, Iowa City, Iowa, and Philadelphia. Its justice practice is in Orlando, Fla. And its sports design practice is in Atlanta. Heery Design offices associated with these practices are also part of this acquisition, along with the firm’s architectural book of business.
“The professionals joining S/L/A/M in this transaction are returning to a traditional design firm that values creativity, and is passionate about design,” said Richard T. Connell, FAIA, S/L/A/M’s chairman, in a prepared statement. Those professionals include Heery Design’s managing directors Russ Sedmak, Mike Holleman, and Douglas Kleppin, AIA, LEED AP.
S/L/A/M’s design portfolio includes healthcare, education, corporate and sports facilities. The firm provides integrated landscape architecture, structural engineering, interior design and construction services, with offices in Connecticut, New York, Atlanta, Boston, and Los Angeles.
A source knowledgeable about this deal, who spoke on background, said that a third party representing CBRE had approached a handful of firms, including S/L/A/M, at the beginning of 2018 about their interest in acquiring parts of Heery. This source said that CBRE was primarily interested in finding a buyer willing to acquire all five of the practices it wanted to shed.
This source adds that what CBRE is holding onto from its Heery purchase is a “much larger” piece than what it is selling to S/L/A/M.
Related Stories
| Apr 8, 2014
40 Under 40 winners: Meet the contractors
Of the up-and-coming AEC professionals to be named to the class of 2014, nine make their living as contractors.
| Apr 7, 2014
40 Under 40 winners: Meet the architects
Of the up-and-coming AEC professionals to be named 40 Under 40 winners by the editors of Building Design+Construction, 21 make their living in the architecture profession.
| Apr 4, 2014
$25 million Orion Jet Center designed by SchenkelShultz now open
As the centerpiece of the 45-acre campus, which is its first phase of a planned 215-acre mixed-use development, the 18,000 square foot executive terminal facility offers spacious passenger areas, administrative space, an executive suite, rental car kiosk, catering and a cafe.
| Apr 3, 2014
Security, accountability, and cloud access: Can you really have it all?
I’ve heard countless stories of conversations between project engineers and IT professionals who can’t come to an agreement on the level of security needed to protect their data while making it more accessible—not only externally, but also internally.
| Apr 2, 2014
The new model of healthcare facility management
A growing number of healthcare organizations are moving to an integrated real estate model in an effort to better manage costs, respond to regulatory requirements, and support changes in patient care delivery.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Apr 2, 2014
Check out the stunning research facility just named 2014 Lab of the Year [slideshow]
NREL's Energy Systems Integration Facility takes top honors in R&D Magazine's 48th annual lab design awards.
| Apr 1, 2014
The risks of mismatched fire-rated assemblies
Mismatched fire-rated glass and framing happens more often than you think. Failing to confirm that the tested and listed performance capabilities of the framing system match those of the glazing can create a financial nightmare for the entire building team.
| Apr 1, 2014
Planned global commerce center breaks ground near Phoenix
When completed, PhoenixMart will be one of the largest single-level trade centers in the U.S.
| Apr 1, 2014
Paints, coatings and sealants: Choosing products and procedures for best performance
This course covers life cycle assessment, color selection, emissions, durability, resilience, corrosion resistance, specification standards, and other critical aspects of choosing coatings for interior and exterior walls, ceilings, and roofs.