flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skybridge connects a terminal and airport on each side of the U.S.-Mexico border

Airports

Skybridge connects a terminal and airport on each side of the U.S.-Mexico border

Cross Border Xpress is the first phase of a larger development that will include hotels and offices.  


By John Caulfield, Senior Editor | December 13, 2015
Skybridge connects a terminal and airport on each side of the U.S.-Mexico border

Images courtesy Latitude 33.

The airport in Tijuana, Mexico, is literally within walking distance of the U.S.-Mexico border. And cross-country travel is now a bit easier with the Dec. 9 opening of Cross Border Xpress, a 390-foot-long, 33-foot wide skywalk bridge for use by ticketed airline passengers to cross between San Diego and Tijuana Airport.

This is the first project to join a foreign airport terminal with the U.S., according to the Los Angeles Times, which reports that the $120 million private venture expects to serve 2.4 million fliers annually.

The CBX terminal, located on 55 acres between the border crossings at San Ysidro and Otay Mesa on the California side, is open 24 hours a day, and six airlines—Aeromexico, Aeromexico Connect, Interject, VivaAerobus (a no-frills carrier that doesn’t operate in southern California), Volaris, and Aero Califia—provide customer service. 

“A project of this magnitude was no small feat and took cooperation from a large number of stakeholders in the United States and Mexico to make it a reality,” says Jim Kilgore, Senior Associate with Latitude 33, the San Diego-based planning and engineering firm that, in association with Otay-Tijuana Venture LLC, provided land entitlements, construction documents, and construction staking services for this project. “Travel, tourism, business and access to both San Diego and Tijuana will be much improved as a result of this facility.” 

Otay-Tijuana Venture is a private investment group with U.S. and Mexican shareholders that include PAP Corp., PALAREO Inc., and EGI-Otay Investors. Invex and Banomext were the lenders for this project.

The CBX facility is a collaboration between the Mexico-based architectural firm Legorreta y Legorreta and Stantec. In Mexico, the contractors included Grumesa, Espazio, Corey and Fercon Qualitas. U.S. contractors included The Harrison Company, Hazard Construction, and Turner Construction.   

Here’s how CBX works. Passengers flying into Tijuana International Airport pick up their bags and then purchase or print a CBX ticket at the baggage claim area. (Crossings are free through Dec. 18, and then $18 one way for adults, with discounts for seniors and children.) They can skywalk across the border to the terminal in San Diego County, where they can catch a cab, bus, shuttle or Uber to downtown San Diego, 22 miles away, or other destination points. U.S. Customs mans a checkpoint at the bridge for those people entering the country.

Conversely, passengers coming from San Diego can purchase and print CBX and airline tickets at the full-service terminal, and use the skywalk to access the airport in Mexico, which offers flights to 50 cities.

CBX’s backers estimate that U.S. passengers currently account for nearly 60% of that airport’s customers.

“This will be a great new option for travel between the U.S. and Mexico,” Jerry Sanders, president and CEO of the San Diego Regional Chamber of Commerce, told Fox 5 in San Diego.

The 90,000-sf terminal is the first phase of a 60-acre site that will incorporate two hotel sites, as well as commercial, office, industrial, and shipping facilities over this project’s 10-year buildout. 

 

Tags

Related Stories

Airports | Feb 6, 2015

Zaha Hadid-designed terminal in Beijing will be world’s largest

The terminal will accommodate 45 million passengers per year, and will be a hub for both air and rail travel.

| Jan 2, 2015

Construction put in place enjoyed healthy gains in 2014

Construction consultant FMI foresees—with some caveats—continuing growth in the office, lodging, and manufacturing sectors. But funding uncertainties raise red flags in education and healthcare.

BIM and Information Technology | Dec 28, 2014

The Big Data revolution: How data-driven design is transforming project planning

There are literally hundreds of applications for deep analytics in planning and design projects, not to mention the many benefits for construction teams, building owners, and facility managers. We profile some early successful applications.  

| Dec 28, 2014

AIA course: Enhancing interior comfort while improving overall building efficacy

Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.

| Dec 28, 2014

The future of airport terminal design: destination status, five-star amenities, stress-free travel

Taking a cue from the hospitality industry, airport executives are seeking to make their facilities feel more like destinations, writes HOK's Richard Gammon.

| Dec 15, 2014

HOK-designed Anaheim Regional transit hub opens, expected to serve three million per year

ARTIC’s flexible design ensures that it can serve as a southern terminus for California’s future high-speed rail system.

| Dec 8, 2014

Moshe Safdie wants to reinvent airports with Jewel Changi Airport addition

A new addition to Singapore's Changi Airport, designed by Moshe Safdie, will feature a waterfall and extensive indoor gardens.

| Nov 19, 2014

The evolution of airport design and construction [infographic]

Safety, consumer demand, and the new economics of flight are three of the major factors shaping how airlines and airport officials are approaching the need for upgrades and renovations, writes Skanska USA's MacAdam Glinn.

| Nov 18, 2014

Grimshaw releases newest designs for world’s largest airport

The airport is expected to serve 90 million passengers a year on the opening of the first phase, and more than 150 million annually after project completion in 2018. 

| Nov 14, 2014

JetBlue opens Gensler-designed International Concourse at JFK

The 175,000-sf extension includes the conversion of three existing gates to international swing gates, and the addition of three new international swing gates.

boombox1
boombox2
native1

More In Category

Airports

SOM unveils ‘branching’ structural design for new Satellite Concourse 1 at O’Hare Airport

The Chicago Department of Aviation has revealed the design for Satellite Concourse 1 at O’Hare International Airport, one of the nation’s business airports. Designed by Skidmore, Owings & Merrill (SOM), with Ross Barney Architects, Juan Gabriel Moreno Architects (JGMA), and Arup, the concourse will be the first new building in the Terminal Area Program, the largest concourse area expansion and revitalization in the airport’s almost seven-decade history. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021