flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skender, Z Modular reach agreement to fabricate multifamily housing components

Building Tech

Skender, Z Modular reach agreement to fabricate multifamily housing components

Factory to open soon on the southwest side of Chicago.


By Peter Fabris, Contributing Editor | April 19, 2019
Skender, Z Modular reach agreement to fabricate multifamily housing components

Skender, a design, construction, and manufacturing firm, will use Z Modular’s self-bracing structural VectorBloc system to fabricate building components. Photos courtesy Skender and Z Modular

Skender and Z Modular have signed an agreement to manufacture multifamily housing components in a factory on the southwest side of Chicago.

Skender, a design, construction, and manufacturing firm, will use Z Modular’s self-bracing structural VectorBloc system to fabricate building components. The aim is to produce “high-quality, multi-story modular housing that addresses a critical affordable housing need in Chicago,” according to a Skender news release.

“Our goal is to revolutionize the delivery of multifamily, hospitality and healthcare projects through modular manufacturing,” said Pete Murray, president, Skender Manufacturing. The VectorBloc steel modular construction system provides “exceptionally tight tolerances to ensure even stacking of the modules, which leads to structurally sound whole buildings,” the news release says.

The fabrication process allows the design flexibility to create a variety of building formats, Skender says. Skender will manufacture three-flat and mid-rise workforce housing buildings, among other applications.

 

Related Stories

Building Tech | Nov 9, 2016

Dubai to Abu Dhabi in 12 minutes: A hyperloop from Hyperloop One and BIG could make it possible

The pods can reach speeds of up to 1,100 kilometers per hour.

Building Tech | Aug 26, 2016

NBBJ’s Goldilocks sensor technology can help employees find a workspace that is just right

The technology measures light levels, humidity and temperature, motion, and sound.

Cultural Facilities | Aug 1, 2016

A retractable canopy at Hudson Yards will transform into a large performing and gallery space

The Shed could become the permanent home for New York’s Fashion Week event.

Building Tech | Jul 14, 2016

Delegates attending political conventions shouldn’t need to ask ‘Can you hear me now?’

Each venue is equipped with DAS technology that extends the building’s wireless coverage.

Sponsored | AEC Tech | Jun 9, 2016

With all these sharks in the water… (No Predictions Here...Part 2)

Rather than fighting to control the proliferation of apps, perhaps we should be training our eyes to look for signs of long-term viability among all the fins in the water

Building Materials | Jun 1, 2016

MIT study: Microscopic structure of natural materials can inspire better concrete

Bones and sea sponges are highly organized at the molecular level, while concrete consists of random composites.

Building Technology | May 24, 2016

Tech is the new office perk, says a new survey of American workers

But most employees still see their companies falling on the dull side of the cutting edge. 

Building Tech | May 9, 2016

3 things to consider for computation in the business of design

In creating a roadmap for computation, Proving Ground's Nathan Miller likes to consider investing in the right people, incorporating a range of skillsets, and defining the business value.

Building Tech | Apr 13, 2016

The Hyperchair gives employees access to their own personal set of climate controls

Not only can the Hyperchair reduce heating and cooling costs and maximize employee comfort, but it can help a company become more environmentally friendly, as well.

Building Tech | Apr 12, 2016

Should we be worried about a tech slowdown?

Is the U.S. in an innovative funk, or is this just the calm before the storm?

boombox1
boombox2
native1

More In Category



Contractors

Contractors expect to spend more time on prefabrication, according to FMI study

Get ready for a surge in prefabrication activity by contractors. FMI, the consulting and investment banking firm, recently polled contractors about how much time they were spending, in craft labor hours, on prefabrication for construction projects. More than 250 contractors participated in the survey, and the average response to that question was 18%. More revealing, however, was the participants’ anticipation that craft hours dedicated to prefab would essentially double, to 34%, within the next five years.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021