flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska will provide embodied carbon assessments on all new projects over 53,000 sf

Codes and Standards

Skanska will provide embodied carbon assessments on all new projects over 53,000 sf

Will use the Embodied Carbon in Construction Calculator it helped create.


By Peter Fabris, Contributing Editor | November 17, 2021
CO2

Courtesy Pixabay

Skanska USA Building will provide initial embodied carbon assessments on every new construction project it works on greater than 5,000m3 (53,000 sf).

The company will use the Embodied Carbon in Construction Calculator (EC3), a product it co-created with industry partners. Skanska USA Building has been piloting EC3 in partnership with Skanska Commercial Development in the U.S. since 2019.

“The data and tools provided by Skanska’s evaluations provide customers with actionable information to make significant and lasting choices about reducing carbon on their projects,” said Paul Hewins, president & CEO, Skanska USA Building. “Customers have the power to positively affect the supply chain if they choose to invest in full or partial materials tracking and reporting.”

Use of the EC3 tool over the last two years has shown that a 30% reduction in embodied carbon is typically achievable for little or no cost, Skanska says. Skanska recently partnered with the Rocky Mountain Institute on a study that produced similar results.

EC3 is available free and open source at www.buildingtransparency.org.

Related Stories

Codes and Standards | Sep 22, 2021

Cities need to step up flood mitigation efforts to save lives

Recent storms highlight climate change dangers.

Codes and Standards | Sep 21, 2021

Steps to improve ventilation for Covid can combat colds and flu

New look at airborne disease spread shows time viruses linger in air may have been underestimated.

Codes and Standards | Sep 15, 2021

USGBC will change leaders, conduct strategic review

Aims to ensure organization is ‘well positioned to scale its work in the post-pandemic world’.

Codes and Standards | Sep 15, 2021

LEED-certified offices earn higher rents than non-sustainable properties

Are also more resilient to dips in real estate market.

Codes and Standards | Sep 7, 2021

Boston turns to developer fees to fund flood protection infrastructure

Assessments on commercial properties will help build seawall and other protective measures.

Codes and Standards | Sep 3, 2021

Low-cost methods can have substantial impact on reducing embodied carbon

Whole-building design, material substitution, and specification strategies can slash carbon by up to 46%.

Codes and Standards | Sep 2, 2021

Case for power resiliency in buildings grows with more disaster and outages

Essential businesses like data centers, hospitals are first adopters of new storage systems.

Codes and Standards | Aug 31, 2021

UK industry group wants mandatory whole-life carbon assessments of buildings

Aims to address hidden emissions embedded in supply chains.

Codes and Standards | Aug 31, 2021

Home electrification will require code upgrades

Residential electric panel capacity must be increased.

Codes and Standards | Aug 30, 2021

Facebook’s new $800 million Arizona data center to save big on water

Will restore more than 200 million gallons of water per year to river basins.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021