Skanska USA, a provider of construction management, preconstruction, and design-build services, moved its Philadelphia Metro office moved to a newly designed, highly energy-efficient space in Blue Bell, Pa.
The new 19,100-sf office was built by Skanska’s Special Projects Group and is expected to achieve LEED for Commercial Interiors Gold certification from the USGBC.
In keeping with Skanska’s commitment to being green, the new office features numerous innovative, environmentally-sound elements. For example, all counter tops, carpet tiles, and stone tile flooring contain 40% recycled content. In addition, Skanska utilized renewable materials for finishes, such as Lumicor accent panels (which are R4 recycled resins made from crushed recycled glass) throughout the office.
The office’s layout also allows for a natural daylight-based lighting scheme. Combined with the use of Energy Star-rated computers and appliances and new energy-efficient lighting throughout the office, the new space is expected to significantly reduce energy costs in the first year. The optimal design also provides Skanska’s employees with an open atmosphere, allowing for more collaboration, interaction and communication amongst coworkers.
The project was completed on schedule in just four months. The architect was KlingStubbins. +
Related Stories
| May 7, 2013
First look: Golden State Warriors stadium by Snøhetta, AECOM
Architects Snøhetta and AECOM have revealed their latest renderings of a new stadium for NBA basketball team the Golden State Warriors on the waterfront in San Francisco.
| May 7, 2013
Renovated bridge building will anchor Nashville riverfront master plan
Renovations to the former Nashville Bridge Company building were recently completed, including a newly-built modern wing. The facility has been re-dubbed The Bridge Building and now offers spaces for meetings, parties, weddings, and other events.
| May 7, 2013
First look: Adrian Smith + Gordon Gill skyscraper designed to 'confuse the wind'
The 400-meter-high, 116-story Imperial Tower in Mumbai will feature a slender, rounded form optimized to withstand the area's strong wind currents.
| May 6, 2013
SAFTI FIRST announces 3D Autodesk Revit models for fire rated wall, window, and door systems
SAFTI FIRST, leading USA-manufacturer of fire rated glass and faming systems, is proud to announce that Autodesk Revit models are now available for its fire rated walls, window and door systems via www.safti.com and Autodesk Seek.
| May 6, 2013
7 major multifamily residential projects in the works
A $140 million redevelopment of a landmark, 45-building apartment complex in Los Angeles is among the nation's significant multifamily developments under way.
| May 3, 2013
5 common failures in paints and coatings
As experienced designers, contractors, and owners know, most paint and coating problems are correctable, but some are especially stubborn to address. Here is a partial compendium of typical failure modes and methods for addressing the problem.
| May 3, 2013
'LEED for all GSA buildings,' says GSA Green Building Advisory Committee
The Green Building Advisory Committee established by the General Services Administration, officially recommended to GSA that the LEED green building certification system be used for all GSA buildings as the best measure of building efficiency.
| May 3, 2013
SMPS Foundation accepting applications for Ron Garikes Student Scholarship
The SMPS Foundation is now accepting scholarship applications from eligible students majoring in marketing, communications, or public relations who are planning a career in professional services marketing in the architecture, engineering, and construction industry.