Skanska USA, a provider of construction management, preconstruction, and design-build services, moved its Philadelphia Metro office moved to a newly designed, highly energy-efficient space in Blue Bell, Pa.
The new 19,100-sf office was built by Skanska’s Special Projects Group and is expected to achieve LEED for Commercial Interiors Gold certification from the USGBC.
In keeping with Skanska’s commitment to being green, the new office features numerous innovative, environmentally-sound elements. For example, all counter tops, carpet tiles, and stone tile flooring contain 40% recycled content. In addition, Skanska utilized renewable materials for finishes, such as Lumicor accent panels (which are R4 recycled resins made from crushed recycled glass) throughout the office.
The office’s layout also allows for a natural daylight-based lighting scheme. Combined with the use of Energy Star-rated computers and appliances and new energy-efficient lighting throughout the office, the new space is expected to significantly reduce energy costs in the first year. The optimal design also provides Skanska’s employees with an open atmosphere, allowing for more collaboration, interaction and communication amongst coworkers.
The project was completed on schedule in just four months. The architect was KlingStubbins. +
Related Stories
| Jul 2, 2014
SHoP designs what would be Brooklyn's tallest building
JDS Development partners with SHoP to construct a 70-story building at 775-feet tall, unprecedented for downtown Brooklyn.
| Jul 2, 2014
The doctor is in the firehouse: New clinic to be built in California fire station
Designed by WRNS Studio, the Firehouse Clinic will encourage local residents with limited healthcare access to consider them as an alternative to the emergency room, especially for preventive care.
| Jul 2, 2014
Emerging trends in commercial flooring
Rectangular tiles, digital graphic applications, the resurgence of terrazzo, and product transparency headline today’s commercial flooring trends.
| Jul 2, 2014
Grimshaw's 'kit of parts' design scheme selected for Qatar sports facilities program
The series of projects, called the Al Farjan Recreational Sports Facilities, have been designed in such a way that the same basic design can be adapted to the specific requirements of each site.
| Jul 1, 2014
Peter Zumthor's LA art museum plan modified with bridge-like section across main thoroughfare
After his design drew concerns about potential damage to LA's La Brea Tar Pits, Peter Zumthor has dramatically revised his concept for the Los Angeles Museum of Art.
| Jul 1, 2014
China's wild circular skyscraper opens in Guangzhou [slideshow]
The 33-story Guanghzou Circle takes the shape of a giant ribbon spool, with the floor space housed in a series of boxes suspended between two massive "wheels."
| Jul 1, 2014
Hyper-speed rendering: How Gensler turns BIM models into beauty shots in seconds
In search of a fast rendering solution, Gensler looked to the gaming and moviemaking industries for the next breakthrough tool: Octane Render.
| Jul 1, 2014
Sochi's 'kinetic façade' may steal the show at the Winter Olympics
The temporary pavilion for Russian telecom operator MegaFon will be wrapped with a massive digital "pin screen" that will morph into the shape of any face.
| Jul 1, 2014
7 ways to cut waste in BIM implementation
Process mapping, split models, and streamlined coordination meetings are among the timesaving techniques AEC firms are employing to improve BIM/VDC workflows.
| Jul 1, 2014
Winning design by 3XN converts modernist bathhouse to university library
Danish firm 3XN's design wins competition for a new educational facility for Mälardalen University in Sweden, which will house a library, communal spaces, and offices for 4,500 students and staff.