flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska promotes Aparicio and hires Leintz in Southern California

Skanska promotes Aparicio and hires Leintz in Southern California

Aparicio and Leintz are both based in Skanska’s Los Angeles office.


By By BD+C Staff | February 14, 2012

Skanska USA’s Civil Construction business unit announced the promotion of Mike Aparicio to executive vice president for its western region and the hiring of Mark Leintz as vice president of operations. 

Aparicio has been leading Skanska USA Civil’s activities in Los Angeles and will now oversee its entire west coast operations, which includes Los Angeles and Riverside, Calif. and Seattle, Wash.

Aparicio is a third-generation California contractor based in Skanska’s L.A. office. For more than 30 years, he has led some of the largest design-build projects in the west, including the $1 billion Los Angeles Metro Gold Line Projects, and, since joining Skanska, the $575 million Expo Line Phase 2 project. He attended Loyola-Marymount University and Linfield College. 

Additionally, Skanska hired Mark Leintz as vice president of operations. Leintz has nearly 30 years of experience in the industry, most recently leading Granite’s large projects group in the west. Starting out as a field engineer, Mark has built his career to oversee work in California, Colorado, Texas, and Florida. Leintz will be based in Skanska’s Los Angeles office, reporting to Aparicio, and will play a key part in Skanska’s pursuit of projects utilizing design-build and other alternative delivery methods. Leintz has a degree in civil engineering from the Colorado School of Mines. BD+C

Related Stories

| Feb 29, 2012

Report says BIPV glass market to reach $6.4 billion by 2016

The report analyzes the opportunities for BIPV glass products using c-Si, thin-film and OPV/DSC materials and provides eight-year forecasts in terms of MW and square footage shipped as well as forecasts of revenue generated.

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021