flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska promotes Aparicio and hires Leintz in Southern California

Skanska promotes Aparicio and hires Leintz in Southern California

Aparicio and Leintz are both based in Skanska’s Los Angeles office.


By By BD+C Staff | February 14, 2012

Skanska USA’s Civil Construction business unit announced the promotion of Mike Aparicio to executive vice president for its western region and the hiring of Mark Leintz as vice president of operations. 

Aparicio has been leading Skanska USA Civil’s activities in Los Angeles and will now oversee its entire west coast operations, which includes Los Angeles and Riverside, Calif. and Seattle, Wash.

Aparicio is a third-generation California contractor based in Skanska’s L.A. office. For more than 30 years, he has led some of the largest design-build projects in the west, including the $1 billion Los Angeles Metro Gold Line Projects, and, since joining Skanska, the $575 million Expo Line Phase 2 project. He attended Loyola-Marymount University and Linfield College. 

Additionally, Skanska hired Mark Leintz as vice president of operations. Leintz has nearly 30 years of experience in the industry, most recently leading Granite’s large projects group in the west. Starting out as a field engineer, Mark has built his career to oversee work in California, Colorado, Texas, and Florida. Leintz will be based in Skanska’s Los Angeles office, reporting to Aparicio, and will play a key part in Skanska’s pursuit of projects utilizing design-build and other alternative delivery methods. Leintz has a degree in civil engineering from the Colorado School of Mines. BD+C

Related Stories

Building Team Awards | Apr 9, 2015

IPD-driven fusion facility serves science and student life in Chicago

In dire need of modern science labs and a student union, North Park University built both—in the same building.

Building Team Awards | Apr 9, 2015

‘Prudent, not opulent’ sets the tone for this Catholic hospital

This Building Team stuck with a project for seven years to get a new hospital built for a faithful client.

Building Team Awards | Apr 9, 2015

9/11 museum triumphs over controversy

The Building Team for this highly visible project had much more than design, engineering, and construction problems to deal with.

Building Team Awards | Apr 7, 2015

Unique test facility will help make wind power more feasible

A new facility at Clemson University makes it possible to test the huge stresses that large-scale wind turbines must be able to withstand.

Cultural Facilities | Apr 7, 2015

Mies’ Martin Luther King Jr. Library to get makeover

The architects say the modernization aims to improve “Mies in a contemporary Miesian way.”

Cultural Facilities | Apr 6, 2015

Berkeley’s West Branch Library generates more energy than it uses

The 9,400-sf facility is California's first Net Zero Energy-certified building.

Codes and Standards | Apr 6, 2015

Industry groups petition for change order reform on federal projects

Nine design and construction associations ask for assurance that funds available for additional work.

High-rise Construction | Apr 6, 2015

Melbourne tower will light up depending on weather

The tower will be illuminated by 164-foot-tall beams of LED light based on weather updates from the Bureau of Meteorology. 

BIM and Information Technology | Apr 3, 2015

French startup develops drone camera that overlays video with 3D images

The new drones can capture video and overlay the shot results with 3D images and augmented reality remotely.

Libraries | Apr 2, 2015

6 award-winning libraries showcase next-gen design strategies

The new Cedar Rapids Public Library and the restored Slover Library in Norfolk, Va., are among six breakthrough projects honored with 2015 AIA/ALA Library Building Awards.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021