flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska, Foster + Partners team up on development of first commercial 3D concrete printing robot

Skanska, Foster + Partners team up on development of first commercial 3D concrete printing robot

Loughborough University has been working on the project since 2007.


By BD+C Staff | December 1, 2014
Skanska, Foster + Partners, and engineers at Loughborough University (LU) are working together to create the first commercial 3D concrete printing robot. 
 
LU has been working on the project since 2007, but the new partnership is recent, according to ArchDaily. Skanska will participate in an 18-month program with a consortium of partners to develop a robot capable of printing complex structural components with concrete. Robotics firm ABB and aggregates suppliers Buchan Concrete and Lafarge Tarmac will be a part of the consortium, as well.
 
“3D concrete printing, when combined with a type of mobile prefabrication center, has the potential to reduce the time needed to create complex elements of buildings from weeks to hours,” stated Skanska Director Rob Francis. “We expect to achieve a level of quality and efficiency which has never been seen before in construction.”
 
Check out this video about LU's 3D printing research: 
 

Related Stories

| May 29, 2012

AIA expands Documents-On-Demand service??

Six new documents added, DOD offers nearly 100 contract documents.  

| May 29, 2012

Legrand achieves over 20% energy-intensity reduction in Presidential Challenge

West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.

| May 24, 2012

Construction backlog declines 5.4% in the first quarter of 2012?

The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

| May 23, 2012

MBI Modular Construction Campus Launched on BDCUniversity.com

White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.

| May 23, 2012

Gifford joins Perkins Eastman as principal

Design and planning expertise in science, technology, education, and healthcare.

boombox1
boombox2
native1

More In Category




Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021