flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Skanska to build the Beacon High School in New York City

Skanska to build the Beacon High School in New York City

The Beacon High School will be located in the Hell’s Kitchen neighborhood of Manhattan.


By Posted by Tim Gregorski, Senior Editor | August 15, 2012
Beacon High School groundbreaking ceremony.
Beacon High School groundbreaking ceremony.

Skanska signed a contract with the New York City School Construction Authority (NYCSCA) to convert an existing New York Public Library book storage facility into the new Beacon High School in New York. The contract value for Skanska is $88 million.

Skanska’s work includes extensive demolition as well as the installation of a sub-slab depressurization system, classrooms, science labs and music rooms. The project also includes a two-story addition which will allow for a gymnasium and auditorium to be built for the school’s about 2,900 students.

The Beacon High School will be located in the Hell’s Kitchen neighborhood of Manhattan. The project is scheduled for completion in May 2015. +

Related Stories

| Jun 27, 2012

HDR opens office in Beijing

The Beijing office is HDR’s second location in China; the firm’s other office is in Shanghai.

| Jun 27, 2012

KBE Building wins honor for Armed Forces Reserve Center

The construction phase was completed in just 16 months.

| Jun 27, 2012

SOM’s Baker receives honorary doctorate in engineering from Heriot-Watt University

Baker recognized for his career and influential contribution in the field of structural engineering.

| Jun 25, 2012

Living green wall planned for InterContinental Chicago

Project, with price tag of $2 million to $3 million, needs council approval.

| Jun 25, 2012

AIA-NJ honors DMR Architects

The academic building, completed in 2009, provides classrooms, computer labs, faculty offices, and meeting spaces for the College, which has a steady 7% annual increase in enrollment.

| Jun 25, 2012

Thornton Tomasetti appoints Hofmeister and Zhu to board of directors

The addition of Hofmeister and Zhu brings the number of directors to 10.

| Jun 22, 2012

Golden Gate Bridge Celebrates 75 Years With the Opening of New Bridge Pavilion

With features such as Nichiha's Illumination series panels, super-insulating glass units, and LED lighting, the new Golden Gate Bridge Pavilion not only boasts the bridge's famous international orange, but green sustainability as well  

| Jun 19, 2012

Energy and Commerce Departments Announce New Centers for Building Operations Excellence

Part of Better Buildings Initiative, Centers Will Focus on Energy Efficiency Workforce Development for Building Operations Professionals

| Jun 15, 2012

Beck Group/Atlanta wins AGC Build Georgia Award

Site-specific safety plan, BIM analysis and third-party structural review contributed to successful implementation.

| Jun 15, 2012

Baldwin joins Charlotte office of Perkins Eastman as principal

Experience in healthcare planning and design to expand national healthcare practice in South and Mid-Atlantic.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021