Massachusetts Attorney General Maura Healey cited 66 construction companies with wage theft violations in 2018.
The penalties total $2.7 million, which include almost $1.5 million in restitution and more than $1.2 million in fines. Violations occurred across both private and public work projects including paying improper wages, prevailing wages and overtime; submitting inaccurate certified payroll records; retaliation against workers asserting wage violations; failure to furnish records for inspection; and failure to register and pay apprentices correctly.
One of the largest wage violation assessments was $585,000 for restitution and fines against ERA Equipment LLC and its owners. The company was cited for not paying workers in a timely manner, failure to pay prevailing wage and overtime; failure to provide workers with proper pay stubs; and inadequate recordkeeping.
Healey’s office says that more than 1,030 employees were owed restitution.
Related Stories
Codes and Standards | Sep 5, 2018
New White Paper on Metal Panel Fire Safety Released
Has detailed information for insulation, fire safety requirements in U.S., other countries.
Codes and Standards | Aug 31, 2018
Trade war could make adaptive reuse more attractive
Higher cost of building materials could make rehab a better financial bet.
Codes and Standards | Aug 30, 2018
Metrics should guide strategy for schools seeking LEED certification
Assessing current status helps direct where improvements can have greatest impact.
Codes and Standards | Aug 29, 2018
The 2018 IAPMO solar and swimming pool codes now available
For installation and inspection of public and private swimming pools, spas, and hot tubs.
Codes and Standards | Aug 28, 2018
New York’s green roof program needs reform
Despite incentives, few owners add vegetative roofs.
Codes and Standards | Aug 24, 2018
Resilience, sustainability emphasized in plans for new 23,000-acre city in the Philippines
“A backup for when Manila fails.”
Codes and Standards | Aug 23, 2018
Cities promote deconstruction of old homes with mixed results
Market factors complicate efforts to recycle material from old structures.
Codes and Standards | Aug 22, 2018
Oregon is first state to change building code to allow tall mass timber buildings
Statewide alternate method allows early technical consideration and approval.
Codes and Standards | Aug 21, 2018
First mass timber panel made from structural composite lumber gets APA certification
Said to be much more cost effective than CLT options.
Codes and Standards | Aug 17, 2018
Zoning changes can be crucial to filling large, empty retail spaces
Alternative uses often require action by local officials.