flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Six finalists selected for London’s Illuminated River competition

Architects

Six finalists selected for London’s Illuminated River competition

The competition is searching for the best design for lighting the bridges of central London.


November 11, 2016

Rendering courtesy of Adjaye Associates via The Illuminated River Foundation

The Illuminated River Foundation set up a competition to find the best lighting design scheme for London’s bridges along the river Thames. The project focuses on 17 individual crossings from Albert to Tower with the main goal of unifying these bridges via a light scheme that celebrates the city’s link with the river.

The competition has recently been narrowed down to six shortlisted teams and design concepts from over 100 submissions. The concepts from each team consist of the lighting design for the Chelsea, London, Waterloo, and Westminster bridges as well as a masterplan for the main road, rail, and pedestrian bridges.

Each design is currently on display in a free exhibition located at London’s Royal Festival Hall. A winning design will be selected by a jury of 11 professionals who are being advised by a supporting panel of bridge technicians, green technology and environment experts, and a lighting designer. The jury will make its final decision on Dec. 8, 2016 with the first phase of the project planed to begin in 2018.

You can view videos of each of the shortlisted teams’ concepts below. Click on the concept name for more information.

 

Blurring Boundaries

Adjaye Associates

 

 

The Eternal Story of the River Thames

AL_A

 

 

Synchronizing the City: Its Natural and Urba Rhythms 

Diller Scofidio + Renfro

 

 

Current

Leo Villareal with Lifschutz Davidson Sandilands and Future\Pace

 

 

A River Ain't Too Much To Light

Les Éclairagistes Associés, ecqi ltd., and Federico Pietrella

 

 

Thames Nocturne

Sam Jacob Studio and Simon Heijdens

 

Related Stories

| Aug 11, 2010

'Flexible' building designed to physically respond to the environment

The ecoFLEX project, designed by a team from Shepley Bulfinch, has won a prestigious 2009 Unbuilt Architecture Design Award from the Boston Society of Architects. EcoFLEX features heat-sensitive assemblies composed of a series of bi-material strips. The assemblies’ form modulate with the temperature to create varying levels of shading and wind shielding, flexing when heated to block sunlight and contracting when cooled to allow breezes to pass through the screen.

| Aug 11, 2010

New book provides energy efficiency guidance for hotels

Recommendations on achieving 30% energy savings over minimum code requirements are contained in the newly published Advanced Energy Design Guide for Highway Lodging.   The energy savings guidance for design of new hotels provides a first step toward achieving a net-zero-energy building.

| Aug 11, 2010

Perkins+Will master plans Vedanta University teaching hospital in India

Working together with the Anil Agarwal Foundation, Perkins+Will developed the master plan for the Medical Precinct of a new teaching hospital in a remote section of Puri, Orissa, India. The hospital is part of an ambitious plan to develop this rural area into a global center of education and healthcare that would be on par with Harvard, Stanford, and Oxford.

| Aug 11, 2010

Burt Hill, HOK top BD+C's ranking of the nation's 100 largest university design firms

A ranking of the Top 100 University Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

PBK, DLR Group among nation's largest K-12 school design firms, according to BD+C's Giants 300 report

A ranking of the Top 75 K-12 School Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Turner Building Cost Index dips nearly 4% in second quarter 2009

Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021