When Motorola decided to move its headquarters back to Chicago, it left a 225-acre campus vacant in Schaumburg, Ill. The large plot of land is now being redeveloped into a mixed-use living and entertainment district by UrbanStreet Group and Antunovich Associates.
Dubbed Veridian, the mixed-use development will feature residential space, office space, a hotel, entertainment, dining, and urban-style street retail. The site has been divided into multiple parcels of land, many of which will be sold to individual developers, with the goal being to bring an urban feel to the Chicago suburbs.
Currently, the development is set to feature the already completed Zurich headquarters; two parks, one measuring in at nine acres and one at 13 acres; a retirement village; an assisted living community; the Element at Veridian, a 260-unit luxury apartment building (set for completion in 2020); over 200 townhomes; a Top Golf; an atrium office building; a 220-key hotel; and a retail and entertainment “Town Center.” Motorola Solutions will also maintain a presence as one of Veridian’s corporate anchor tenants.
The retail and entertainment district will be highly walkable and include unique shopping and dining options. Additionally, it will host a variety of entertainment opportunities such as concerts, movies, and ice skating.
See Also: Gensler, Corgan reveal their design concepts for Uber Air Skyports
Antunovich Associates will initially be responsible for the planning and designing of the main Town Center parcel. This parcel will feature approximately 800,000 sf of built area within the retail core, not including the four parking structures that will support it. Construction on a new spine road and infrastructure is slated to begin later this year with phase one completion as soon as Fall of 2020.
Courtesy Veridian.
Related Stories
Multifamily Housing | Feb 24, 2022
First new, mixed-use high-rise in Detroit’s central business district in nearly 30 years opens
City Club Apartments completed two multifamily projects in 2021 in downtown Detroit including the first new, mixed-use high-rise in Detroit’s central business district in nearly 30 years.
Office Buildings | Feb 23, 2022
The Beam on Farmer, Arizona’s first mass timber, multi-story office building tops out
The Beam on Farmer, Arizona’s first mass timber, multi-story office building, topped out on Feb. 10, 2022.
Mixed-Use | Feb 9, 2022
David Chipperfield Architects to design Schützenstraße mixed-use development in Munich
The firm recently won a competition for the project.
Mixed-Use | Jan 13, 2022
Details unveiled for Atlanta’s Campus 244 mixed-use development
S9 Architecture is designing the project.
Mixed-Use | Jan 10, 2022
Mixed-use Arsenal Yards completes in Watertown’s East End
PCA master-planned the seven-building, one million sf destination and designed the urban village, residences, and open spaces.
Mixed-Use | Jan 5, 2022
Waterfront Station II breaks ground in Washington, D.C.
The mixed-use project will include 30% affordable housing.
Mixed-Use | Dec 21, 2021
Riverside Wharf will be Miami’s newest entertainment complex
Cube3 Architects is designing the project.
Mixed-Use | Nov 11, 2021
New mixed-use development breaks ground in Miami Beach
Domo Studio is designing the project and Origin Construction is the general contractor.
Mixed-Use | Oct 22, 2021
40 West 12th residential tower opens in Atlanta’s Midtown neighborhood
The project is part of the 1105 West Peachtree Development.
Multifamily Housing | Oct 20, 2021
Sacramento’s first luxury high-rise rental residences announced
Southern Land Company is developing the project.