Measuring 1,017-feet across, the national sports stadium within the Singapore Sports Hub is the world’s largest free-spanning dome, Dezeen reports.
The retractable dome can open and close to adjust the stadium’s interior with the island-nation’s capricious tropical climate.
The stadium, located in Singapore’s waterfront Kallang area, opened in June 2014. It was designed by a group of engineers and designers from Arup, DP Architects, and AECOM as part of the 86-acre sporting complex.
The stadium seats 55,000 people underneath its canopy, which is kept open when the stadium is not in use to help keep the grass pitch in good condition.
The retractable roof sections are made from translucent ETFE plastic, and the panels are supported with metal rigging that arches over the main pitch.
The stadium hosts a range of sports activities, such as cricket and rugby, and is the home base of Singapore’s national football team.
Find out more on Dezeen.
Related Stories
| Mar 7, 2012
Firestone iPad app offers touch technology
Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.
| Mar 7, 2012
LEO A DALY opens new office in Riyadh, Saudi Arabia
Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.
| Mar 7, 2012
Turner appointed Batson-Cook CFO and treasurer
Cecil G. Hood to continue in advisory role.
| Mar 7, 2012
Thornton Tomasetti names Dowdall VP of Kansas City office
Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.
| Mar 7, 2012
LEO A DALY selected to design Minnesota Fallen Firefighters Memorial
The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.
| Mar 7, 2012
Houlihan Lokey adds Steffen to Industrials Group
Steffen bolsters group with experience in the building materials and rorest product sectors.
| Mar 6, 2012
Country’s first Green House home for veterans completed
Residences at VA Danville to provide community-centered housing for military veterans.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 6, 2012
Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago
Construction was completed by Skender in just 12 weeks.
| Mar 6, 2012
BLT Architects promotes two to associate
Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.