flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Silver Award: Please Touch Museum at Memorial Hall Philadelphia, Pa.

Silver Award: Please Touch Museum at Memorial Hall Philadelphia, Pa.


August 11, 2010
This article first appeared in the 200909 issue of BD+C.
Memorial Hall’s famed 60-foot dome and granite façade were restored as
part of an $88 million adaptive-reuse project for the Please Touch Museum.

Built in 1875 to serve as the art gallery for the Centennial International Exhibition in Fairmount Park, Memorial Hall stands as one of the great civic structures in Philadelphia. The neoclassical building, designed by Fairmount Park Commission engineer Hermann J. Schwarzmann, was one of the first buildings in America to be designed according to the principles of the Beaux Arts movement. Its signature design, highlighted by an iron-and-glass dome adorned with a 23-foot-tall statue of Columbia, has been emulated by architects across the globe, including those of the Art Institute of Chicago, the Milwaukee Public Museum, the Brooklyn Museum, and the Detroit Institute of Art.

Despite its celebrated past and prominence in the worldwide architecture community, by the 1950s years of delayed maintenance and neglect had left Memorial Hall in dire need of restoration. The situation was exacerbated by a revolving door of tenants that included an industrial arts school, an art museum, a recreation center, a sound recording studio, even a police station. In 2000, the building had to be closed to the public.

In 2002, Memorial Hall received a much-needed jolt when the Please Touch Museum finalized plans to relocate there. The $88 million restoration and adaptive-reuse project took nearly six years from concept through construction, which concluded with the grand opening on October 18, 2008. The project entailed a complete restoration of the exterior granite façade, the 60-foot dome, and all interior paint, plaster, and marble—as well as construction of an addition that houses the museum's cherished, hundred-year-old Woodside Park Dentzel Carousel.

The team cleverly adapted the existing spaces for the exhibits and museum functions. An indoor swimming pool added in 1962 presented the perfect location to “plant” a soaring artificial tree for the Alice's Adventures in Wonderland exhibit. A dark, decrepit maintenance tunnel in the rear of the building was converted into a bright, colorful entrance for large groups walking from the bus drop-off area.

The Reconstruction Awards judges praised the Building Team for saving an architectural masterpiece while also benefiting the community with a world-class children's museum.

“Philadelphia really needed this museum because there's really not a lot for the kids in that area to do,” said judge David P. Callan, PE, LEED AP, SVP with Environmental Systems Design, Chicago. — Dave Barista, Managing Editor

Related Stories

| Jul 26, 2013

How biomimicry inspired the design of the San Francisco Museum at the Mint

When the city was founded in the 19th century, the San Francisco Bay’s edge and marshland area were just a few hundred feet from where the historic Old Mint building sits today. HOK's design team suggested a design idea that incorporates lessons from the local biome while creating new ways to collect and store water.

| Jul 22, 2013

Cultural Facility Report [2013 Giants 300 Report]

Building Design+Construction's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2013 Giants 300 Report.

| Jul 19, 2013

Reconstruction Sector Construction Firms [2013 Giants 300 Report]

Structure Tone, DPR, Gilbane top Building Design+Construction's 2013 ranking of the largest reconstruction contractor and construction management firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Engineering Firms [2013 Giants 300 Report]

URS, STV, Wiss Janney Elstner top Building Design+Construction's 2013 ranking of the largest reconstruction engineering and engineering/architecture firms in the U.S.

| Jul 19, 2013

Reconstruction Sector Architecture Firms [2013 Giants 300 Report]

Stantec, HOK, HDR top Building Design+Construction's 2013 ranking of the largest reconstruction architecture and architecture/engineering firms in the U.S.

| Jul 19, 2013

Renovation, adaptive reuse stay strong, providing fertile ground for growth [2013 Giants 300 Report]

Increasingly, owners recognize that existing buildings represent a considerable resource in embodied energy, which can often be leveraged for lower front-end costs and a faster turnaround than new construction.

| Jul 19, 2013

Must see: 220 years of development on Capitol Hill in one snazzy 3D flyover video

The Architect of the Capitol this week released a dramatic video timeline of 220 years of building development on Capitol Hill.

| Jul 18, 2013

LEGO takes on the iconic Sydney Opera House

This September, LEGO will expand its LEGO Creator Expert series with a 2,989-brick model of the iconic Sydney Opera House.

| Jul 18, 2013

Koolhaas plan selected for Miami Beach Convention Center redevelopment [slideshow]

The master plan by OMA's Rem Koolhaas and Shohei Shigematsu beat out a submission by Danish studio Bjarke Ingels Group for the massive redo of the Miami Beach Convention Center.

| Jul 15, 2013

Innovative Swallows Nest cultural center in Taiwan aims for zero carbon emission

The Swallows Nest cultural center in Taichung, Taiwan, employs bioclimatic architectural elements and complex geometry with a goal of being a zero carbon emission structure.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.


Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 



Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021