![]() |
The Hanna Theatre is the last of five theaters in Cleveland’s Playhouse Square to be renovated and “reimagined” for modern audiences. |
Between February 1921 and November 1922 five theaters opened along a short stretch of Euclid Avenue in downtown Cleveland, all of them presenting silent movies, legitimate theater, and vaudeville. During the Great Depression, several of the theaters in the unofficial “Playhouse Square” converted to movie theaters, but they all fell into a death spiral after World War II. By 1969, four of the five were forced to close.
Only the Hanna Theatre stayed alive, limping along into the '80s with local theater productions and the occasional Broadway preview, until it too went dark in 1989. Ten years later, an investment group led by Playhouse Square—a preservation organization that had already saved Hanna's cousins, the Allen, Ohio, State, and Palace theaters—acquired the historic Hanna Building with the goal of making the Hanna Theatre the permanent home of the Great Lakes Theater Festival.
For local A/E firm Westlake Reed Leskosky, the task of revitalizing the Hanna was compounded by the added assignment of making the space conducive to live concerts, stand-up comedy, corporate outings, and other events for which it was never intended.
WRL's new design significantly reconfigured the original 1,400-seat proscenium stage theater into an intimate 548-seat thrust stage, fully flexible in three independent sections, and adaptable to a 572-seat proscenium mode. Equipped with hydraulic lifts that can raise and lower parts of the stage at a rate of up to two feet per second as well as a new structurally independent fly system and improved acoustical, A/V, and lighting systems, the venue provides unparalleled production flexibility. General contractor Turner Construction completed the project in 8½ months, in time for the theater's opening performance September 20, 2008. —Jeffrey Yoders, Senior Associate Editor
Related Stories
| Nov 29, 2011
SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China
Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.
| Nov 22, 2011
Jones Lang LaSalle completes construction of two new stores in Manhattan
Firm creates new global design standard serving as project manager for Uniglo’s 89,000-sf flagship location and, 64,000-sf store.
| Oct 24, 2011
BBS Architects & Engineers receives 2011 Sustainable Design Award from AIA Long Island Chapter
AIA LI also recognized BBS with the 2011 ARCHI Award Commendation for the St. Charles Resurrection Cemetery St. Charles Resurrection Cemetery Welcoming and Information Center in Farmingdale, NY.
| Oct 14, 2011
University of New Mexico Science & Math Learning Center attains LEED for Schools Gold
Van H. Gilbert architects enhances sustainability credentials.
| Oct 12, 2011
Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health
Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will
| Sep 30, 2011
BBS Architects & Engineers completes welcoming center at St. Charles Resurrection Cemetery
The new structure serves as the cemetery's focal architectural point and center of operations.
| Sep 14, 2011
Lend Lease’s role in 9/11 Memorial & Museum
Lend Lease is honored to be the general contractor for the National September 11 Memorial & Museum project at the World Trade Center site in New York City.
| Sep 12, 2011
Living Buildings: Are AEC Firms up to the Challenge?
Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.
| May 25, 2011
Olympic site spurs green building movement in UK
London's environmentally friendly 2012 Olympic venues are fuelling a green building movement in Britain.