flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers

Sika Sarnafil Roof Recycling Program recognized by Society of Plastics Engineers


By By BD+C Staff | November 9, 2011
University of Iowa, Hawkeye Arena Always looking for opportunities to recycle materials that would otherwise end up in the lan
This article first appeared in the December 2011 issue of BD+C.

Sika Sarnafil has won the Plastics Recycling Technologies and Applications Award from the Society of Plastics Engineers. Sika's PVC recycling program is designed to recover and recycle vinyl-roofing membrane back into new roofing membrane at the end of its useful life.

The award was presented at the society’s Global Plastics Environmental Conference (GPEC 2011) in Atlanta, and distinguishes the program that was recognized by the Massachusetts Executive Office of Energy and Environmental Affairs in 2009. Sika Sarnafil is the only single ply roofing manufacturer with a program to recycle old roofs back into roofing membrane at the end of its useful life and the only company to have its recycling claims verified by UL Environment. Since 2004, Sika Sarnafil has recycled 27.4 million pounds of post-industrial vinyl and 852,000 pounds of post-consumer, old roofs since 2005.

“Sika Sarnafil continues to address energy conservation issues with this ground breaking resource recovery program,” said Brian Whelan, Senior Vice President, Sika Sarnafil. “We divert more than 98% of our vinyl raw materials from the waste stream by recycling them into roofing and waterproofing membranes. And, we make it easy for customers to achieve their sustainability goals, with energy-efficient solutions that minimize waste and environmental impact.”

Sika Sarnafil’s major roof recycling projects include:

  • Canadian Tire in Toronto – This project demonstrated Canadian Tire’s green policy and implemented the three “R’s of Green” – reduce, reuse, recycle
  • General Motors – In a real-world demonstration of “closed loop” recycling, Sika Sarnafil completed the largest vinyl roof recycling project in North America at a General Motors Customer Care & Aftersales building in Lansing, Mich.
  • Target – Numerous stores, including a retail center in Silver Spring, Md., have worked with Sika Sarnafil. This roof recycling project contributed to the goal of helping Target to become a “zero waste” company
  • The Burlington Coat Factory – A 120,000 sf roof portion of the Briggsmore Shopping Center in Modesto, Calif. was replaced with a new Sika Sarnafil system while the old roof will live on and be recycled into other Sika Sarnafil products.
  • University of Iowa, Hawkeye Arena – Always looking for opportunities to recycle materials that would otherwise end up in the landfill, the university was very excited about recycling its old roofing membranes
  • The Marriott Long Wharf Hotel on Boston Harbor – Sika Sarnafil’s first major roofing recycling project in North America in 2005, this project kicked off Sika Sarnafil’s roof recycling program.

The program is streamlined and simple, making it easy for contractors and building owners to participate. Sika ships containers and pallets to contractors free of charge. The recycled materials are simply loaded and turned over to Sika for processing. Contractor labor costs related to recycling are minimal, if any, and are often offset by savings in municipal disposal fees. BD+C

Related Stories

| Feb 2, 2012

Shawmut Design and Construction launches sports venues division

Expansion caps year of growth for Shawmut.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Feb 2, 2012

Delk joins Gilbane Building Co.

Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.

| Feb 2, 2012

Next phase of construction begins on Scripps Prebys Cardiovascular Institute

$456 million Institute will be comprehensive heart center for 21st Century.

| Feb 1, 2012

Increase notched in construction jobs, but unemployment rate still at 16%

AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.

| Feb 1, 2012

Replacement windows eliminate weak link in the building envelope

Replacement or retrofit can help keep energy costs from going out the window.

| Feb 1, 2012

‘Augmented reality’ comes to the job site

A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.

| Feb 1, 2012

New ways to work with wood

New products like cross-laminated timber are spurring interest in wood as a structural material.

| Feb 1, 2012

Blackney Hayes designs school for students with learning differences

The 63,500 sf building allows AIM to consolidate its previous two locations under one roof, with room to expand in the future. 

| Feb 1, 2012

Two new research buildings dedicated at the University of South Carolina

The two buildings add 208,000 square feet of collaborative research space to the campus.

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021