flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SHoP Architects plans to turn NY's Seaport District into pedestrianized, mixed-use area

SHoP Architects plans to turn NY's Seaport District into pedestrianized, mixed-use area

The scheme includes a proposed 500-foot luxury residential tower that would jut out into the harbor, extending the Manhattan grid out into the waterfront.


By BD+C Staff | December 15, 2014
Renderings: SHoP Architects
Renderings: SHoP Architects

Restoration plans for New York City’s historic Seaport District have surfaced, and SHoP Architects’s plan is to turn it into a mixed use, pedestrianized area, ArchDaily reports.

The scheme includes a proposed 500-foot luxury residential tower that would jut out into the harbor, extending the Manhattan grid out into the waterfront.

According to the architects, the Seaport District proposal “provides a vision of restoration and revitalization for this historic waterfront neighborhood. While South Street Seaport is currently a waterfront access hub for commuters, boaters, and tourists, it is also home to long-neglected historical elements and impediments to foot traffic.”

“The principal of this mixed-use project is to extend the Manhattan city fabric toward the water, defying the current barriers created by South Street and the FDR drive, and creating continuous pedestrian connections and increased waterfront access. The addition of retail, residential, cultural, and educational facilities will transform the waterfront area to an essential asset for the community and the city.”

“Restoration of the historic Tin Building will breathe new vitality into a long-neglected structure and provide a plaza and marketplace in a previously abandoned space. The residential building on the New Market site will complement both the history and future of the seaport in its aesthetic and materiality, and will include retail spaces as well as a school on its lower levels.”

“The Seaport project as a whole embraces the district’s nautical and commercial history at the same time as it rethinks the relationship between the city grid and the waterfront.”

 

Related Stories

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021