Restoration plans for New York City’s historic Seaport District have surfaced, and SHoP Architects’s plan is to turn it into a mixed use, pedestrianized area, ArchDaily reports.
The scheme includes a proposed 500-foot luxury residential tower that would jut out into the harbor, extending the Manhattan grid out into the waterfront.
According to the architects, the Seaport District proposal “provides a vision of restoration and revitalization for this historic waterfront neighborhood. While South Street Seaport is currently a waterfront access hub for commuters, boaters, and tourists, it is also home to long-neglected historical elements and impediments to foot traffic.”
“The principal of this mixed-use project is to extend the Manhattan city fabric toward the water, defying the current barriers created by South Street and the FDR drive, and creating continuous pedestrian connections and increased waterfront access. The addition of retail, residential, cultural, and educational facilities will transform the waterfront area to an essential asset for the community and the city.”
“Restoration of the historic Tin Building will breathe new vitality into a long-neglected structure and provide a plaza and marketplace in a previously abandoned space. The residential building on the New Market site will complement both the history and future of the seaport in its aesthetic and materiality, and will include retail spaces as well as a school on its lower levels.”
“The Seaport project as a whole embraces the district’s nautical and commercial history at the same time as it rethinks the relationship between the city grid and the waterfront.”
Related Stories
| Dec 1, 2014
Skanska, Foster + Partners team up on development of first commercial 3D concrete printing robot
Skanska will participate in an 18-month program with a consortium of partners to develop a robot capable of printing complex structural components with concrete.
| Dec 1, 2014
How public-private partnerships can help with public building projects
Minimizing lifecycle costs and transferring risk to the private sector are among the benefits to applying the P3 project delivery model on public building projects, according to experts from Skanska USA.
High-rise Construction | Dec 1, 2014
ThyssenKrupp develops world’s first rope-free elevator system
ThyssenKrupp's latest offering, named MULTI, will allow several cabins in the same shaft to move vertically and horizontally.
| Nov 29, 2014
20 tallest towers that were never completed
Remember the Chicago Spire? What about Russia Tower? These are two of the tallest building projects that were started, but never completed, according to the Council on Tall Buildings and Urban Habitat. The CTBUH Research team offers a roundup of the top 20 stalled skyscrapers across the globe.
| Nov 26, 2014
USITT Selects Bahrain National Theatre for Honor Award
The Bahrain National Theatre will be recognized with an Honor Award by the United States Institute for Theatre Technology (USITT) in 2015.
| Nov 26, 2014
How the 'maker culture' brings the power of design to life
Most people affiliate the maker culture with metal working, welding, ceramics, glass blowing, painting, and soldering. But it also includes coding and online content creation, writes Gensler’s Douglas Wittnebel.
| Nov 26, 2014
U.S. Steel decides to stay in Pittsburgh, plans new HQ near Penguins arena
The giant steelmaker has agreed to move into a new headquarters that is slated to be part of a major redevelopment.
Sponsored | | Nov 26, 2014
It’s time to start trusting your employees more
A recent study published in the journal Psychological Science revealed that employees were 26% more satisfied in their roles when they had positions of power. SPONSORED CONTENT
Sponsored | | Nov 26, 2014
What’s in a coating?
A beautiful coating on metal products can make a strong statement, whether used on a high-end commercial project or an industrial building. SPONSORED CONTENT
Sponsored | | Nov 26, 2014
Virtual reality in 3D models, iPhone thermal imaging: Inside one very cool tech toybox
A little over a year ago, I embarked on a search to find individuals in the AEC space who were putting new hardware to work in the field.