flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Shigeru Ban-designed Aspen Art Museum will open doors to public this week

Shigeru Ban-designed Aspen Art Museum will open doors to public this week

The new location with 17,500 sf of exhibition space is in the heart of downtown Aspen.


By BD+C Staff | August 5, 2014

After seeing a 200% increase in budget, number of students served, and annual visitors in recent years, the Aspen Art Museum deserved a makeover. After 18 months of planning and construction, the museum will finally open its new Shigeru Ban-designed facility to the public on August 9.

The Japanese architect and 2014 Pritzker Architecture Prize winner is known for using lightweight materials, true to the traditional construction requirements in his earthquake-prone homeland. Ban also has a knack for elevating disaster relief with style and simplicity. The new Aspen Art Museum is no outcast in his portfolio of simple, crisp structures.

Located in the heart of downtown Aspen, with a 360-view of the mountainous landscape, the Aspen Art Museum is a cube structure sheathed on two sides with a distinctive woven-wood screen, Architecture Lab reports.

Not only does the museum now have triple the amount of exhibition space at 17,500 sf, the rooftop also has a sculpture garden that makes use of the beautiful view of the Rockies.

Related Stories

| Jul 18, 2012

Legat & Kingscott relocates architecture/interior design office

Move enables the architecture/interior design firm to better serve its expanding clientele.

| Jul 18, 2012

Alcoa appoints Hunter Architectural Manager

Hunter to operate with the goal of driving specification, new product adoption and overall demand for the Alcoa BCS North America product range.

| Jul 17, 2012

AIA and Architecture for Humanity select Disaster Response Grant recipients

Awards help each group implement their locally driven preparedness project in the second half of the year.  

| Jul 17, 2012

KM/Plaza changes name to Plaza Construction

Lands new projects including the Perry South Beach Hotel and Dadeland Mall Kendall Wing Expansion.

| Jul 17, 2012

Dr. Phillips Charities Headquarters Building receives LEED Silver

The building incorporates sustainable design features, environmentally-friendly building products, energy efficient systems, and environmentally sensitive construction practices.

| Jul 16, 2012

BD+C Under 40 Leadership Summit scheduled

Attendee registration for U40 Summit II now open.

| Jul 16, 2012

Construction spending at 2 ½ year peak

Construction economist Ken Simonson says that four private nonresidential categories each posted 12-month spending increases of more than 25%: power and energy construction, 35%; hotels, 29%; educational and manufacturing, 27% apiece.

| Jul 16, 2012

Chen named design director at Heery

Chen comes to Heery from his own firm, Mark Chen Architect, a design and planning consulting firm, based in New York City, whose recent work includes large-scale planning studies for mixed-use projects.

| Jul 16, 2012

Reed Construction hires new project manager

Fread is a LEED AP and received his degree from Purdue University.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021