Shepley Bulfinch recently announced it has opened a new office in Hartford, Conn. The office, located at 100 Allyn Street, is the firm’s fourth office, joining those in Boston, Houston, and Phoenix.
The firm hopes the new Hartford location will help better serve the needs of clients in the Connecticut and Western Massachusetts region by providing architecture, planning, and interior design services for the area’s universities, healthcare facilities, and urban development and civic organizations.
“An office in Hartford gives us the ability to pursue new clients and projects in the region,” said Carole Wedge, FAIA, LEED AP, CEO of Shepley Bulfinch, in a release. “We have worked in Connecticut and Western Massachusetts for over 45 years for numerous academic and healthcare clients, and we are excited to welcome new leadership to the firm who have long standing experience in the region.”
Related Stories
| Nov 15, 2011
Suffolk Construction breaks ground on the Victor housing development in Boston
Project team to manage construction of $92 million, 377,000 square-foot residential tower.
| Nov 15, 2011
Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa
Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.
| Nov 14, 2011
Summit Design+Build selected at GC for new Office Concepts headquarters
The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout.
| Nov 14, 2011
Griffin Electric completes electrical work at Cary Arts Center
The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.
| Nov 14, 2011
303 East 33rd Street building achieves LEED-NC
The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.
| Nov 14, 2011
VanSumeren appointed to Traco general manager
VanSumeren will draw on his more than 20 years of experience in manufacturing management and engineering to deliver operational and service excellence and drive profitable growth for Traco.
| Nov 11, 2011
By the Numbers
What do ‘46.9,’ ‘886.2,’ and ‘171,271’ mean to you? Check here for the answer.
| Nov 11, 2011
Streamline Design-build with BIM
How construction manager Barton Malow utilized BIM and design-build to deliver a quick turnaround for Georgia Tech’s new practice facility.