Located 6,000 feet above sea level on a nunatak just 10 miles from the summit of the tallest mountain in North America, the Sheldon Chalet is Denali National Park’s first and only luxury hotel. The chalet is located in the Don Sheldon Amphitheater, a natural valley carved by the ice of the Ruth Glacier and named after a famous Alaskan bush pilot and the man behind the Sheldon Chalet.
Sheldon received a patent to start building the Chalet back in the 1970s, but the plans were put on hold due to his sudden death. Decades later, Don’s son, Robert, has now finally completed the project.
The chalet is anchored deep into the granite, iron, and titanium of the nunatak and is equipped with a runoff-powered water supply, electricity, and a Finnish fireplace in a common room that doubles as a high-efficiency, clean-combustion heating system.
Inaccessible by car, guests must take an hour-long helicopter ride to arrive at the five-bedroom chalet. Each room can sleep two guests and is arranged around the central Commons. Amenities include a sauna, viewing station, observation deck, kitchen, and dining area. Marvin windows were installed to give guests 360-degree views of the surrounding peaks. The windows were designed to withstand winds of up to 200 miles per hour.
Outside of the hotel, guests can go snowshoeing and glacier trekking and visit remote hot springs and a Mastodon bone yard. Rates for the luxury experience start at $2,300 per person, per night. BEK of Alaska built the Chalet.
Related Stories
| Sep 10, 2013
The new medical office building: 7 things to know about today’s outpatient clinic
Regulatory pressures, economic constraints, and emerging technologies are transforming healthcare. Learn how Building Teams are responding with efficient, appealing, boundary-blurring outpatient buildings.
| Sep 10, 2013
BUILDINGChicago eShow Daily – Day 2 coverage
The BD+C editorial team brings you this real-time coverage of day 2 of the BUILDINGChicago/Greening the Heartland conference and expo taking place this week at the Holiday Inn Chicago Mart Plaza.
| Sep 4, 2013
Augmented reality goes mainstream: 12 applications for design and construction firms
Thanks to inexpensive mobile devices and increasingly advanced software apps, Building Teams are finally able to bring their BIM models to life on the job site.
| Sep 4, 2013
Smart building technology: Talking results at the BUILDINGChicago/ Greening the Heartland show
Recent advancements in technology are allowing owners to connect with facilities as never before, leveraging existing automation systems to achieve cost-effective energy improvements. This BUILDINGChicago presentation will feature Procter & Gamble’s smart building management program.
| Aug 30, 2013
A new approach to post-occupancy evaluations
As a growing number of healthcare institutions become more customer-focused, post-occupancy evaluations (POE) are playing a bigger role in new construction and renovation projects. Advocate Health Care is among the healthcare organizations to institute a detailed post-occupancy assessment process for its projects.
| Aug 26, 2013
What you missed last week: Architecture billings up again; record year for hotel renovations; nation's most expensive real estate markets
BD+C's roundup of the top construction market news for the week of August 18 includes the latest architecture billings index from AIA and a BOMA study on the nation's most and least expensive commercial real estate markets.
| Aug 22, 2013
Energy-efficient glazing technology [AIA Course]
This course discuses the latest technological advances in glazing, which make possible ever more efficient enclosures with ever greater glazed area.
| Aug 14, 2013
Green Building Report [2013 Giants 300 Report]
Building Design+Construction's rankings of the nation's largest green design and construction firms.
| Jul 31, 2013
Hotel, retail sectors bright spots of sluggish nonresidential construction market
A disappointing recovery of the U.S. economy is limiting need for new nonresidential building activity, said AIA Chief Economist, Kermit Baker in the AIA's semi-annual Consensus Construction Forecast, released today. As a result, AIA reduced its projections for 2013 spending to 2.3%.
| Jul 30, 2013
Better planning and delivery sought for VA healthcare facilities
Making Veterans Administration healthcare projects “better planned, better delivered” is the new goal of the VA’s Office of Construction and Facilities Management.