flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

The Shedd Aquarium unveils its $500 million vision for the future

Museums

The Shedd Aquarium unveils its $500 million vision for the future

The project will prepare the aquarium for the next 100 years.


By David Malone, Managing Editor | January 14, 2022
Shedd Aquarium, exhibit space
All images courtesy Shedd Aquarium

The Shedd Aquarium has unveiled its strategic vision for the next 100 years. The vision, dubbed the Centennial Commitment due to the organization’s 100th anniversary in 2030, is aimed at ensuring a more equitable, sustainable, and thriving future for people and aquatic life.

The Centennial Commitment centers around three primary pillars - For People, For Communities, and For Aquatic Life. These pillars include:

  • Deeper community investments and partnerships
  • A modernized aquarium experience through the transformation and restoration of the historic galleries and dynamic new exhibits that provide greater and more accessible entry points
  • New educational and experiential programs
  • Digital engagements that bring animals and conservation action programs from the aquarium into more hands and homes
  • Advancements in animal care and welfare
  • Accelerated aquatic research and science

Shedd Aquarium learning space

Half of the $500 million budget will power the programs and partnerships needed to achieve the Centennial Commitment’s aspirations while the other half will focus on the needed physical improvements to the historic Beaux-Arts-style building that will modernize the aquarium galleries and experience, enable greater accessibility, enhance animal habitats, and restore architectural features such as the opening of original windows that provide views of the Chicago skyline and Lake Michigan and unobstructed public access to the building’s original exterior promenade and garden spaces.

Shedd Aquarium experiential space

The multi-year, four phase construction project will begin in late 2022. Project highlights include:

  • A modernized experience that will feature more accessible, interactive, highly immersive, and science-rich galleries
  • A new learning commons located at the historic core of the aquarium on the main level that will serve as a launchpad and increase the amount of existing classroom space
  • A centralized science hub that will merge five existing scientific laboratories into one central hub spanning microbial ecology, conservation science, water quality and chemistry, genome studies, and pathology
  • New circulation pathways that will significantly reduce the number of transitions between areas of the aquarium, allowing guests to have multiple options regarding where they can start their journey and making navigation easier.
  • Four acres of activated outdoor green space around the building that will increase natural connections to nature and bolster resilience on the lakefront while also adding experiential blue and environmental improvements.

Shedd Aquarium exhibit

The modernization of the historic galleries will serve as the largest capital project for the organization in recent history, preceded by the expansion of the Abbott Oceanarium in 1991 (and its reimagination in 2008), Amazon Rising exhibit in 2001, and Wild Reef exhibit in 2003.

The build team will include Pepper/BMI Construction (general contractor partners), Valerio Dewalt Train (architect), Thinc Design (exhibit design partner), JLL (project manager), Institute for Human Centered Design (accessibility partner), and Trinal (equity and inclusion partner).

Construction is slated to conclude in 2026 with new galleries, programs, and experiences opening each year on a rolling basis.

Tags

Related Stories

Museums | Mar 24, 2016

Aquarium of the Pacific unveils whale of a project

Designed by EHDD, the 18,000-sf, whale-shaped Pacific Visions will have gathering spots, galleries, and a theater with a large, curved screen.

Museums | Mar 3, 2016

How museums engage visitors in a digital age

Digital technologies are opening up new dimensions of the museum experience and turning passive audiences into active content generators, as Gensler's Marina Bianchi examines.

Museums | Feb 12, 2016

Construction begins on Foster + Partners’ Norton Museum of Art expansion project

The Florida museum is adding gallery space, an auditorium, great hall, and a 20,000-sf garden.

Architects | Feb 11, 2016

Stantec agrees to acquire VOA Associates

This deal reflects an industry where consolidation is a strategic necessity for more firms.

Museums | Feb 5, 2016

Diller Scofidio + Renfro transforms old Art Deco building into a museum at UC Berkeley

The Berkeley Art Museum and Pacific Film Archive, which opened in late January, contains a theater, lab, and galleries. It was once a printing plant.

Museums | Jan 22, 2016

Canadian Canoe Museum selects Heneghan Peng Architects’ design for new location

The single-story structure is designed for sustainability as well as function.

Architects | Jan 15, 2016

Best in Architecture: 18 projects named AIA Institute Honor Award winners

Morphosis' Perot Museum and Studio Gang's WMS Boathouse are among the projects to win AIA's highest honor for architecture.

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Museums | Dec 18, 2015

Santiago Calatrava-designed museum with skeletal roof opens in Rio

The Museu do Amanhã addresses the future of the planet and has an inventive, futuristic design itself.

Museums | Dec 16, 2015

Gluckman Tang-designed museums could stimulate economy in North Adams, Mass.

The goal is to create a “cultural corridor” between North Adams and Williamstown, Mass.  

boombox1
boombox2
native1

More In Category

Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021