Shawmut Design and Construction has been awarded an extensive renovation contract involving three dormitory buildings at Brown University.
The project will enhance the first-year experience of Brown students, and includes a top-to-bottom renovation of Metcalf and Miller Halls, which will be converted into double occupancy bedrooms. The connection between Metcalf and Miller Halls to Andrews Hall will be removed, creating three independent structures.
Andrews Hall will also undergo an extensive renovation. Where possible, Shawmut will convert one, two and three student bedrooms into double occupancy rooms. Kitchenette and recycling closet space on each floor will be combined to create a common area lounge. The exterior of the buildings will also be restored.
“Shawmut’s ability to continually deliver important projects on time and on budget has forged our long-lasting relationship with Brown University,” said Ron Simoneau, Vice President of Shawmut. “We look forward to continuing this exciting partnership in 2012 and beyond.”
Metcalf, Miller, and Andrews Halls are located on the Pembroke Campus on Lloyd Avenue in Providence. Construction is scheduled to begin in June 2012, and will be completed by December 2012. BD+C
Related Stories
| Dec 10, 2011
BIM tools to make your project easier to manage
Two innovations—program manager Gafcon’s SharePoint360 project management platform and a new BIM “wall creator” add-on developed by ClarkDietrich Building Systems for use with the Revit BIM platform and construction consultant—show how fabricators and owner’s reps are stepping in to fill the gaps between construction and design that can typically be exposed by working with a 3D model.
| Dec 9, 2011
BEST AEC FIRM 2011: Chapman Construction/Design
Taking sustainable practices to heart.
| Dec 9, 2011
BEST AEC FIRMS 2011: EYP Architecture & Engineering
Expertise-Driven Design: At EYP Architecture & Engineering, growing the business goes hand in hand with growing the firm’s people.
| Dec 8, 2011
Keast & Hood Co. part of Statue of Liberty renovation team
Keast & Hood Co., is the structural engineer-of-record for the year-long $27.25 million renovation of the Statue of Liberty.
| Dec 8, 2011
HDR opens office in Shanghai
The office, located in the Chong Hing Finance Center in Shanghai’s busy Huangpu District, will support HDR’s design efforts throughout Asia.
| Dec 8, 2011
HOK elevates the green office standard
Firm achieves LEED Platinum certification in New York office that overlooks Bryant Park.