Shawmut Design and Construction has been awarded an extensive renovation contract involving three dormitory buildings at Brown University.
The project will enhance the first-year experience of Brown students, and includes a top-to-bottom renovation of Metcalf and Miller Halls, which will be converted into double occupancy bedrooms. The connection between Metcalf and Miller Halls to Andrews Hall will be removed, creating three independent structures.Â
Andrews Hall will also undergo an extensive renovation. Where possible, Shawmut will convert one, two and three student bedrooms into double occupancy rooms. Kitchenette and recycling closet space on each floor will be combined to create a common area lounge. The exterior of the buildings will also be restored.
“Shawmut’s ability to continually deliver important projects on time and on budget has forged our long-lasting relationship with Brown University,” said Ron Simoneau, Vice President of Shawmut. “We look forward to continuing this exciting partnership in 2012 and beyond.”
Metcalf, Miller, and Andrews Halls are located on the Pembroke Campus on Lloyd Avenue in Providence. Construction is scheduled to begin in June 2012, and will be completed by December 2012. BD+C
Related Stories
| May 23, 2012
MBI Modular Construction Campus Launched on BDCUniversity.com
White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.
| May 23, 2012
Gifford joins Perkins Eastman as principal
Design and planning expertise in science, technology, education, and healthcare.
| May 23, 2012
McRitchie joins McCarthy Building as VP, commercial services in southern California
McRitchie brings more than 18 years of experience in the California construction marketplace.
| May 23, 2012
Arizona Army National Guard Readiness Center awarded LEED Silver
LEED certification of the AZ ARNG Readiness Center was based on a number of green design and construction features SAIC implemented that positively impacted the project and the broader community.
| May 23, 2012
New hospitals invest in data centers to manage growth in patient info
Silver Cross became one of the first hospitals to install patient tracking software so families know where a patient is at all times. New communication equipment supports wireless voice and data networks throughout the hospital, providing access to patients and their families while freeing clinicians to use phones and computers where needed instead of based on location.
| May 23, 2012
Summit Design+Build selected as GC for Chicago restaurant
Little Goat will truly be a multifunctional space. Construction plans include stripping the 10,000 sq. ft. building down to the bare structure everywhere, the installation of a new custom elevator and adding square footage at the second floor with an addition.
| May 22, 2012
Batson-Cook names Partin VP of Business Development
Partin joins general contractor from Georgia Hospital Association.
| May 22, 2012
Casaccio Architects and GYA Architects join to form Casaccio Yu Architects
Architects Lee A. Casaccio, AIA, LEED AP, and George Yu, AIA, share leadership of the new firm.
| May 22, 2012
O’Connell Robertson acquires Mitchell Design Consultancy
Mary Ann A. Mitchell, AIA, IIDA, MDC principal and founder, joins O’Connell Robertson as part of the acquisition.