Shawmut Design and Construction has been awarded an extensive renovation contract involving three dormitory buildings at Brown University.
The project will enhance the first-year experience of Brown students, and includes a top-to-bottom renovation of Metcalf and Miller Halls, which will be converted into double occupancy bedrooms. The connection between Metcalf and Miller Halls to Andrews Hall will be removed, creating three independent structures.
Andrews Hall will also undergo an extensive renovation. Where possible, Shawmut will convert one, two and three student bedrooms into double occupancy rooms. Kitchenette and recycling closet space on each floor will be combined to create a common area lounge. The exterior of the buildings will also be restored.
“Shawmut’s ability to continually deliver important projects on time and on budget has forged our long-lasting relationship with Brown University,” said Ron Simoneau, Vice President of Shawmut. “We look forward to continuing this exciting partnership in 2012 and beyond.”
Metcalf, Miller, and Andrews Halls are located on the Pembroke Campus on Lloyd Avenue in Providence. Construction is scheduled to begin in June 2012, and will be completed by December 2012. BD+C
Related Stories
| Aug 21, 2012
Hong Kong’s first LEED Platinum pre-certified building opens
Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.
| Aug 21, 2012
Stellar wins four ABC Excellence In Construction awards
ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.
| Aug 20, 2012
Protecting the artifacts at George H.W. Bush Presidential Library and Museum
Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.
| Aug 17, 2012
Ferreri joins PGAL as Principal
Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.
| Aug 17, 2012
Centric Architecture and PLAD Studio merge
The new firm will retain Centric Architecture as its name.
| Aug 15, 2012
MBH Architects announces new appointments
MBH Architects continues to grow, take on new clients.
| Aug 15, 2012
Architects and designers challenged in Allsteel’s reality design competition
KITS mobile app offers flexibility in planning.
| Aug 14, 2012
Leo A Daly welcomes Carl Gentilcore
Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.
| Aug 14, 2012
SOM Foundation announces prize recipients for 2012
Submissions for the SOM Prize were received from students at 34 schools in the U.S.
| Aug 9, 2012
Slideshow: New renderings of 1 WTC
Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.