Last year, California opened 10,793 hotel rooms, a record for the state according to Atlas Hospitality Group. California has 859 hotels and 125,749 rooms in various stages of planning. In Los Angeles alone, where 4,309 hotel rooms opened last year, there are another 5,327 rooms under construction.
Those projects include Soho Warehouse, a major renovation, designed by Killefer Flammang Architects, of a six-story 100-year building in L.A.’s Arts District; and the boutique Hoxton Hotel, a $30 million renovation, designed by GREC Architects, of a 10-story building along the city’s downtown Broadway corridor that dates back to 1925.
Shawmut Design and Construction is handling the construction management for both of these hotels. The growth of Los Angeles’ hospitality sector has become a driving force behind the expansion of Shawmut’s L.A. office, designed by Gensler, which recently added 2,400 sf and is now 15,000 sf.
Shawmut has been doing business in L.A. since 1995, and moved into its first office, on Wilshire Boulevard, in February 2013. It relocated to its current office, west side of the city, in February 2016. Over the past three years, revenue generated by Shawmut’s L.A. office increased by 61%, and its staff by 92% to its current level of 123 employees.
“Originally, we set up an office here to serve our existing clients that were expanding,” says Vincent Spataro, an 11-year Shawmut veteran who moved to L.A. in 2014 to help grow this office as its director. “As time went on, we’ve hired local staff and developed a local client base.”
Shawmut positions its services in California as being selective about the projects it takes on. “We aren’t the lowest-priced bidder here, so we focus more on the higher end.” Its work in the restaurant and retail sectors, for example, includes Nobu Malibu and Louis Vuitton’s Rodeo Drive flagship.
Eighteen months ago, the office launched a Luxury Homes division, an offshoot of residential construction it had been doing as a service for its commercial clients. “It’s a meaningful move for us,” Les Hiscoe, Shawmut’s CEO, told the Beverly Hills Courier. Spataro says this division manages the construction of one-off houses whose costs range from $1,000 to $2,000 per sf. “These are on another scale, and often have commercial-type systems” that Shawmut’s experience can serve, he explains.
More recently, Shawmut launched a national Interiors division, which Spataro says will bring to office design what the firm has brought to retail and restaurants.
Spataro says the future growth of his office will most likely come from hospitality and interiors. Shawmut L.A. is also looking to expand the typologies it handles to include institutional and academic projects, which have been robust areas for the firm’s New England office.
Related Stories
Reconstruction & Renovation | Mar 5, 2015
Chicago's 7 most endangered properties
Preservation Chicago released its annual list of historic buildings that are at risk of being demolished or falling into decay.
Office Buildings | Mar 5, 2015
Goettsch Partners unveils plans for dual office towers in Warsaw
The Mennica Legacy Tower development is divided into a 35-story tower located on the south east side of the site and a 10-story building on the west side.
Hotel Facilities | Mar 4, 2015
Hotel construction pipeline reaches six-year high
After a three-year bottoming formation, the pipeline for hotel construction has posted five consecutive quarters of double-digit year-over-year growth.
High-rise Construction | Mar 4, 2015
Must see: Egypt planning 656-foot pyramid skyscraper in Cairo
Zayed Crystal Spark Tower will stand 200 meters tall and will be just a short distance from the pyramids of Giza.
Office Buildings | Mar 3, 2015
Former DuPont lab to be converted into business incubator near UPenn campus
The new Pennovation Center will provide collaborative and research spaces for educators, scientists, students, and the private sector.
Sponsored | BIM and Information Technology | Mar 3, 2015
The great debate: Is 3D PDF really BIM?
You can pull apart buildings, cut through floors, and view simulated animation for assembly instructions all within a PDF.
Codes and Standards | Mar 2, 2015
Proposed energy standard for data centers, telecom buildings open for public comment
The intent of ASHRAE Standard 90.4P is to create a performance-based approach that would be more flexible and accommodating of innovative change.
Contractors | Mar 2, 2015
Nonresidential construction spending dips in January, still outpaced 2014
Nonresidential construction spending fell 2% in January, which is the largest setback to spending since January 2014, according to the March 2 release from the U.S. Census Bureau.
K-12 Schools | Mar 1, 2015
Are energy management systems too complex for school facility staffs?
When school districts demand the latest and greatest, they need to think about how those choices will impact the district’s facilities employees.
Industrial Facilities | Feb 27, 2015
Massive windmill will double as mixed-use entertainment tower in Rotterdam
The 571-foot structure will house apartments, a hotel, restaurants, even a roller coaster.