Shawmut Design and Construction, located at 560 Harrison Avenue in Boston, has announced the promotion of Randy Shelly to Vice President of the company’s Hospitality Group. Shelly will replace veteran Paul Doherty, who has accepted a new position within Shawmut.
“Randy has been a staple in our Hospitality Group for nearly a decade and has an exceptional understanding of the unique needs of our hospitality clients,” said Les Hiscoe, Executive Vice President and COO of Shawmut Design and Construction. “We look forward to his continued leadership to grow our Hospitality Group in 2013 and beyond.”
Shelly’s promotion to Vice President of Hospitality comes on the heels of the Company’s expansion into the Los Angeles market, establishing an office on the West Coast to better serve its growing client base in the hospitality and retail markets. In addition, he will oversee hospitality operations in the New York and Las Vegas offices.
Shelly has spent eight out of his 10 years at Shawmut in leadership positions within this group. He first joined Shawmut in 2002 as a Project Executive on Apple and Louis Vuitton, then moved to Hospitality where he served as Director of Construction Operations. Most recently, Shelly launched Shawmut’s Sports Venues Group which will continue under his leadership within the Hospitality Group.
Over the course of his 25 years of experience in the construction industry, Shelly has cultivated relationships and led project teams for some of the most prestigious names in the industry including Thomas Keller Restaurant Group, Nobu, Union Square Hospitality Group, MetLife Stadium, and Delaware North Companies.
Shelly holds a B.S. in Construction Management from Bowling Green State University in Bowling Green, Ohio.
About Shawmut Design and Construction
Shawmut Design and Construction is a national construction management firm that builds exciting projects for distinguished clients. As an ESOP (employee-owned) company, Shawmut’s main objective is delivering exceptional, personalized service to clients. Project teams take the time to truly listen to clients’ goals and concerns while implementing comprehensive tools and services. Shawmut’s unique business model allows project teams to better service clients by focusing their specialized expertise within one of the following areas: academic, commercial, corporate interiors, cultural and historic, gaming, healthcare and science, hotels, restaurants, retail, spas and health clubs, and sports venues. Shawmut has offices located in Boston, Providence, New York, Las Vegas and Los Angeles. For more information, please visit www.shawmut.com.
Related Stories
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.
| Oct 13, 2010
Hospital and clinic join for better patient care
Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.