Shawmut Design and Construction, located at 560 Harrison Avenue in Boston, has announced the promotion of Randy Shelly to Vice President of the company’s Hospitality Group. Shelly will replace veteran Paul Doherty, who has accepted a new position within Shawmut.
“Randy has been a staple in our Hospitality Group for nearly a decade and has an exceptional understanding of the unique needs of our hospitality clients,” said Les Hiscoe, Executive Vice President and COO of Shawmut Design and Construction. “We look forward to his continued leadership to grow our Hospitality Group in 2013 and beyond.”
Shelly’s promotion to Vice President of Hospitality comes on the heels of the Company’s expansion into the Los Angeles market, establishing an office on the West Coast to better serve its growing client base in the hospitality and retail markets. In addition, he will oversee hospitality operations in the New York and Las Vegas offices.
Shelly has spent eight out of his 10 years at Shawmut in leadership positions within this group. He first joined Shawmut in 2002 as a Project Executive on Apple and Louis Vuitton, then moved to Hospitality where he served as Director of Construction Operations. Most recently, Shelly launched Shawmut’s Sports Venues Group which will continue under his leadership within the Hospitality Group.
Over the course of his 25 years of experience in the construction industry, Shelly has cultivated relationships and led project teams for some of the most prestigious names in the industry including Thomas Keller Restaurant Group, Nobu, Union Square Hospitality Group, MetLife Stadium, and Delaware North Companies.
Shelly holds a B.S. in Construction Management from Bowling Green State University in Bowling Green, Ohio.
About Shawmut Design and Construction
Shawmut Design and Construction is a national construction management firm that builds exciting projects for distinguished clients. As an ESOP (employee-owned) company, Shawmut’s main objective is delivering exceptional, personalized service to clients. Project teams take the time to truly listen to clients’ goals and concerns while implementing comprehensive tools and services. Shawmut’s unique business model allows project teams to better service clients by focusing their specialized expertise within one of the following areas: academic, commercial, corporate interiors, cultural and historic, gaming, healthcare and science, hotels, restaurants, retail, spas and health clubs, and sports venues. Shawmut has offices located in Boston, Providence, New York, Las Vegas and Los Angeles. For more information, please visit www.shawmut.com.
Related Stories
| Dec 17, 2010
Cladding Do’s and Don’ts
A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.
| Dec 17, 2010
5 Tips on Building with SIPs
Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.
| Dec 17, 2010
How to Win More University Projects
University architects representing four prominent institutions of higher learning tell how your firm can get the inside track on major projects.
| Dec 13, 2010
Energy efficiency No. 1 priority for commercial office tenants
Green building initiatives are a key influencer when tenants decide to sign a commercial real estate lease, according to a survey by GE Capital Real Estate. The survey, which was conducted over the past year and included more than 2,220 office tenants in the U.S., Canada, France, Germany, Sweden, the UK, Spain, and Japan, shows that energy efficiency remains the No. 1 priority in most countries. Also ranking near the top: waste reduction programs and indoor air.
| Dec 7, 2010
Are green building RFPs more important than contracts?
The Request for Proposal (RFP) process is key to managing a successful LEED project, according to Green Building Law Update. While most people think a contract is the key element to a successful construction project, successfully managing a LEED project requires a clear RFP that addresses many of the problems that can lead to litigation.
| Dec 7, 2010
Blue is the future of green design
Blue design creates places that are not just neutral, but actually add back to the world and is the future of sustainable design and architecture, according to an interview with Paul Eagle, managing director of Perkins+Will, New York; and Janice Barnes, principal at the firm and global discipline leader for planning and strategies.
| Dec 7, 2010
Green building thrives in shaky economy
Green building’s momentum hasn’t been stopped by the economic recession and will keep speeding through the recovery, while at the same time building owners are looking to go green more for economic reasons than environmental ones. Green building has grown 50% in the past two years; total construction starts have shrunk 26% over the same time period, according to “Green Outlook 2011” report. The green-building sector is expected to nearly triple by 2015, representing as much as $145 billion in new construction activity.
| Dec 7, 2010
USGBC: Wood-certification benchmarks fail to pass
The proposed Forest Certification Benchmark to determine when wood-certification groups would have their certification qualify for points in the LEED rating systemdid not pass the USGBC member ballot. As a result, the Certified Wood credit in LEED will remain as it is currently written. To date, only wood certified by the Forest Stewardship Council qualifies for a point in the LEED, while other organizations, such as the Sustainable Forestry Initiative, the Canadian Standards Association, and the American Tree Farm System, are excluded.
| Dec 7, 2010
AGC of A Survey: 2011 Construction Industry Hiring and Business Outlook
The Associated General Contractors of America wants to know about your construction company’s business outlook for 2011. Help out the Association by answering a few quick questions in their 2011 Construction Industry Hiring and Business Outlook survey.