Shawmut Design and Construction has launched a dedicated Sports Venues division that will specialize in the management of construction projects at stadiums, arenas, and other athletic facilities across the country.
The launch of Shawmut’s Sports Venues division is the result of momentum established by the completion of more than two dozen projects at some of the nation’s marquee stadiums, including: MetLife Stadium, home of the National Football League’s New York Giants and New York Jets; TD Garden, home of the National Hockey League’s Boston Bruins and the NBA’s Boston Celtics; Yankee Stadium, home of Major League Baseball’s New York Yankees; Oriole Park at Camden Yards, home of Major League Baseball’s Baltimore Orioles; Fenway Park, home of Major League Baseball’s Boston Red Sox; and Alumni Stadium at Boston College.
Shawmut’s Sports Venues division will be overseen by Randy Shelly. Shelly joined Shawmut in 2002, and has more than 25 of years of experience in the construction industry where he has cultivated relationships and managed projects with some of the most prestigious names in sports venues, restaurants, and retail, including Delaware North Companies, MetLife Stadium, Apple and Louis Vuitton. BD+C
Related Stories
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.
| Oct 13, 2010
Modern office design accentuates skyline views
Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.