flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.


By By BD+C Staff | October 26, 2011
Because the mall remains open during construction projects, one of Shawmuts top priorities is to mitigate the noise and dust cr

Shawmut Design and Construction, located at 560 Harrison Avenue in Boston, has been awarded construction of the new Tag Heuer store at the Aventura Mall, located at 19501 Biscayne Boulevard in Aventura, Fla.

The project features a 1,200 sf fit out, and is designed by Sawicki Tarella Architects. Because the mall remains open during construction projects, one of Shawmut’s top priorities is to mitigate the noise and dust created by the project to minimize disruption to the present guest experience.

The project began this month, and is scheduled to be completed by end of the year.

This is the second store build Tag Heuer has awarded Shawmut Design and Construction. The first location, at City Center in Las Vegas, was completed earlier this year.

Shawmut is the top construction management firm for the world’s most popular and exclusive brands. In 2011, Shawmut has managed construction projects for Tag Heuer, Lacoste, Uniqlo, Tiffany & Co., Tom Ford, Louis Vuitton, Jimmy Choo, Gucci, Chanel, Barney’s, and Apple. BD+C

Related Stories

| Feb 2, 2012

Delk joins Gilbane Building Co.

Delk to focus on healthcare construction programs and highly complex higher education facilities for Gilbane Building Company’s Southwest region.

| Feb 2, 2012

Next phase of construction begins on Scripps Prebys Cardiovascular Institute

$456 million Institute will be comprehensive heart center for 21st Century.

| Feb 1, 2012

Increase notched in construction jobs, but unemployment rate still at 16%

AGC officials said that construction employment likely benefited from unseasonably warm weather across much of the country that extended the building season.

| Feb 1, 2012

Replacement windows eliminate weak link in the building envelope

Replacement or retrofit can help keep energy costs from going out the window.

| Feb 1, 2012

‘Augmented reality’ comes to the job site

A new software tool derived from virtual reality is helping Building Teams use the power of BIM models more effectively.

| Feb 1, 2012

New ways to work with wood

New products like cross-laminated timber are spurring interest in wood as a structural material.

| Feb 1, 2012

Blackney Hayes designs school for students with learning differences

The 63,500 sf building allows AIM to consolidate its previous two locations under one roof, with room to expand in the future. 

| Feb 1, 2012

Two new research buildings dedicated at the University of South Carolina

The two buildings add 208,000 square feet of collaborative research space to the campus.

| Feb 1, 2012

List of Top 10 States for LEED Green Buildings released?

USGBC releases list of top U.S. states for LEED-certified projects in 2011.

| Feb 1, 2012

ULI and Greenprint Foundation create ULI Greenprint Center for Building Performance

Member-to-member information exchange measures energy use, carbon footprint of commercial portfolios.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021