flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.


By By BD+C Staff | October 26, 2011
Because the mall remains open during construction projects, one of Shawmuts top priorities is to mitigate the noise and dust cr

Shawmut Design and Construction, located at 560 Harrison Avenue in Boston, has been awarded construction of the new Tag Heuer store at the Aventura Mall, located at 19501 Biscayne Boulevard in Aventura, Fla.

The project features a 1,200 sf fit out, and is designed by Sawicki Tarella Architects. Because the mall remains open during construction projects, one of Shawmut’s top priorities is to mitigate the noise and dust created by the project to minimize disruption to the present guest experience.

The project began this month, and is scheduled to be completed by end of the year.

This is the second store build Tag Heuer has awarded Shawmut Design and Construction. The first location, at City Center in Las Vegas, was completed earlier this year.

Shawmut is the top construction management firm for the world’s most popular and exclusive brands. In 2011, Shawmut has managed construction projects for Tag Heuer, Lacoste, Uniqlo, Tiffany & Co., Tom Ford, Louis Vuitton, Jimmy Choo, Gucci, Chanel, Barney’s, and Apple. BD+C

Related Stories

Multifamily Housing | Oct 30, 2020

The Weekly show: Multifamily security tips, the state of construction industry research, and AGC's market update

BD+C editors speak with experts from AGC, Charles Pankow Foundation, and Silva Consultants on the October 29 episode of "The Weekly." The episode is available for viewing on demand.

AEC Tech | Oct 28, 2020

Meet Jaibot, Hilti's new construction robot

The semi-autonomous robot is designed to assist MEP contractors with ceiling-drilling applications. 

Hotel Facilities | Oct 27, 2020

Hotel construction pipeline dips 7% in Q3 2020

Hospitality developers continue to closely monitor the impact the coronavirus will have on travel demand, according to Lodging Econometrics.

Data Centers | Oct 26, 2020

Speed to market is biggest obstacle for burgeoning data center construction sector

Hyperscale and edge computing are driving growth in data center and mission critical facilities construction.

Adaptive Reuse | Oct 26, 2020

Mall property redevelopments could result in dramatic property value drops

Retail conversions to fulfillment centers, apartments, schools, or medical offices could cut values 60% to 90%.

Multifamily Housing | Oct 15, 2020

L.A., all the way

KFA Architecture has hitched its wagon to Los Angeles’s star for more than 40 years.

Architects | Oct 14, 2020

The Weekly Show: AI for building facade inspections; designing a world-class architecture firm

The October 15 episode of BD+C's "The Weekly" is available for viewing on demand.

Coronavirus | Oct 8, 2020

The Weekly show: Statue of Liberty Museum, emotional learning in K-12, LA's climate change vulnerability

The October 8 episode of BD+C's "The Weekly" is available for viewing on demand.

Architects | Oct 8, 2020

Gensler’s annual report chronicles the firm’s ‘transformation’

The firm positions itself as a leading voice for how building design plays a central role in meeting society’s evolving demands.

Smart Buildings | Oct 1, 2020

Smart buildings stand on good data

The coming disruption of owning and operating a building and how to stay ahead through BIM.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021