Built on the site of a former hotel, Shanghai’s T20 combines office, civic, commercial, and cultural space with elevated green ribbons of public walkways at China’s busiest intersection.
The 215,000-sf building divides its uses by floor. Two underground levels are set aside for commercial space, with one of the levels connecting to the Metro City building by an underground gallery. Floors 1 and 2 house a few hundred square meters of community space. Floors 3 through 7 house the public parking garage. The garage unfolds in the form of a continuous spiral to serve the surrounding offices and businesses.
Photo: Jacques Ferrier Architecture / Photo Luc Boegly.
Floors 8 and 9 are shared office space arranged around a large raised garden. These floors also include a reception area, cafeteria, meeting rooms, auditorium, and spaces for relaxation. Floors 10 through 15 were designed as user-friendly office spaces. The top two floors will comprise the cultural center, which has been designed to “float” on the skyline of the district.
See Also: Berlin’s Museum Island receives its first new building in almost 100 years
The design introduces suspended gardens and plantings throughout to help counteract some of the pollution of the neighboring intersection.
Photo: Jacques Ferrier Architecture / Photo Luc Boegly.
Related Stories
Mixed-Use | Jan 18, 2017
Frank Gehry’s Grand Avenue Project in Los Angeles may finally be ready to break ground
The oft-delayed project was set to begin in 2007 but was halted due to the recession.
Mixed-Use | Dec 1, 2016
Amsterdam’s new sustainable mixed-use building embraces the idea of living on the water
The Sluishuis employs a unique shape that makes it appear different from every vantage point.
Mixed-Use | Dec 1, 2016
Initial work on mixed-use development, The Parks at Walter Reed, is underway
The D.C. development is the product of a partnership between Hines, Urban Atlantic, and Triden Development Group.
Multifamily Housing | Dec 1, 2016
One of Canada’s largest media companies dives into real estate development
Rogers moves forward on M City, a multi-building, multi-year project in a Toronto suburb.
Office Buildings | Nov 15, 2016
Under Armour unveils phase one of 50-acre Baltimore headquarters
The campus will be located in Baltimore’s $5.5 billion Port Covington redevelopment project.
Mixed-Use | Nov 10, 2016
Terraced mixed-use development planned for Shanghai’s urban city ring
The development will be highly accessible and provide ‘humanism’ to the area.
Mixed-Use | Nov 8, 2016
Blue Star Accelerator program seeks to help early stage businesses in the technology, sports, and entertainment industries
Applications for the program are currently being accepted.
High-rise Construction | Nov 1, 2016
Winthrop Square will give rise to Boston’s second tallest building
The building will become the tallest residential tower in the city.
Mixed-Use | Oct 31, 2016
New Frank Gehry project on Sunset Boulevard moves forward with a few compromises
Among the compromises, the 8150 Sunset Blvd. project will see its tallest residential tower reduced by 56 feet.
Mixed-Use | Sep 27, 2016
10 Design wins competition to design huge mixed-use development in China
China Resources Land, New Fenghong Real Estate Development, and China Resources Trust have designated 50 billion yuan for the construction of the development.