flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

SGA uses virtual design and construction technology to redevelop N.Y. building into modern offices

Office Buildings

SGA uses virtual design and construction technology to redevelop N.Y. building into modern offices

287 Park Avenue South is a nine-story Classical Revival building previously known as the United Charities Building.


By David Malone, Associate Editor | July 20, 2017
A rendering of the updated exterior of 287 Park Avenue South from Spagnolo Group Architecture

Rendering courtesy SGA

A 121,059-sf, nine-story building located at 287 South Park Avenue in New York City’s Gramercy Park neighborhood is undergoing a makeover to become a modern office building.

Spagnolo Group Architecture (SGA), the lead architect for the project, is making use of virtual design and construction (VDC) technology to help design, construct, market, and manage the redevelopment. Through the use of the VDC technology, SGA is able to visualize the building improvements and make design changes in real time.

“Our use of VDC technology lets us identify optimum layouts for potential tenants and demonstrate a variety of layout possibilities in three dimensions,” says Brooks Kendall Slocum, Studio Manager, SGA, in a release. “With an understanding of the tenants’ requirements, we can more easily customize layouts in the early stages of design and present them in a visual style that is easy to understand.”

As part of the redesign, all building systems for the project will be upgraded. The upgrades include new HVAC, perimeter heating, telecom, electric, plumbing, fire protection, and an advanced BMS system. Additionally, a new stair core will be created.

The improved building will feature 14-foot ceilings and two lobby entrances with lacquered wood, chiseled limestone, grey marble, brushed granite, and stainless steel finishes. Each office floor will provide about 13,000 sf of space. Arched windows on all four facades will provide the office space with abundant natural light. A penthouse floor will include 22-foot ceilings, an 85-foot skylight, and a private roof terrace.

The project is scheduled for completion in 2018.

Related Stories

Office Buildings | Mar 4, 2021

1905 industrial building set to become Acciona’s new office in Madrid

Foster + Partners is designing the project.

Office Buildings | Mar 3, 2021

Turano Baking Company’s new HQ and test kitchen completes in Oak Park, Ill.

Wright Heerema Architects designed the project.

Office Buildings | Feb 26, 2021

KWK Architects repurposes industrial site and warehouse into office space for Washington University School of Medicine

The project’s first two phases have been completed with the third and final phase under way.

Coronavirus | Feb 24, 2021

COVID-19 spurs need for specific building solutions

A medical supply house’s new call center and a vaccination module that can handle more patients faster are among the latest projects.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Office Buildings | Feb 18, 2021

Bungie breaks ground on new, expanded HQ

NBBJ is designing the project.

Great Solutions | Feb 11, 2021

Simplifying the return to the office

A new web-based tool from Sasaki takes the guesswork out of heading back to the workplace.

Office Buildings | Feb 8, 2021

Six lessons learned from our first Fitwel Viral Response Module certification

The Fitwel Viral Response Module is one of several frameworks that real estate owners and operators can use to obtain third-party certification for their efforts ensuring their properties are ready for a safer and healthier return to work.

Building Owners | Feb 4, 2021

The Weekly show, Feb 4, 2021: The rise of healthy buildings and human performance

This week on The Weekly show, BD+C editors speak with AEC industry leaders from Brookfield Properties, NBBJ, and UL about healthy buildings certification and improving human performance through research-based design.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021